Landscaper Safe Work Method Statement (SWMS)

A Landscaper Safe Work Method Statement (SWMS) is a written document outlining high-risk construction work activities, associated hazards, and risk control measures. It is a legal requirement under the Work Health and Safety Regulations 2011 (Cth). The document ensures PCBUs meet duties under the Work Health and Safety Act 2011 by detailing specific steps to manage site safety.

Safe Work Method Statement for landscaping work including earthmoving, paving, retaining walls, and plant operation on residential and commercial properties.

Use Free Template
Create your custom version — free to start

20 free credits on signup — no card needed

template
moderate
high Risk

About this Document

What Is a Landscaper SWMS?

A Safe Work Method Statement (SWMS) is a written document that outlines the high-risk work activities carried out at a workplace. It details the hazards associated with these activities and the control measures put in place to manage those risks. For Australian landscapers, this document is not just administrative paperwork. It is a legal requirement for specific types of work and a vital tool for keeping crews safe on site.

In the landscaping industry, an SWMS focuses on the practical steps needed to do a job safely. It explains the work sequence, identifies potential dangers like underground power lines or unstable trenches, and sets clear rules for how the team will mitigate those dangers. If you are a Person Conducting a Business or Undertaking (PCBU), you are responsible for ensuring this document is prepared and followed.

The primary purpose of a Landscaper SWMS is to protect the health and safety of workers and others. It also serves as evidence that you have met your duties under the Work Health and Safety Act 2011 (WHS Act). If an inspector visits your site or an incident occurs, the SWMS is the first document they will ask to see.

You might also use other documents like Job Safety Analysis (JSA) for lower-risk tasks, but for high-risk construction work, the SWMS is mandatory.

When to Use This Document

You must prepare a SWMS before any High Risk Construction Work (HRCW) begins. This is a strict requirement under the Work Health and Safety Regulations 2011 (Cth) and mirror state regulations. Landscaping often involves activities that fall squarely into the HRCW category. It is not a choice; if the work fits the definition, the SWMS must be ready before the job starts.

Specific landscaping tasks that trigger the need for a SWMS include:

  • Excavation work: This includes trenches deeper than 1.5 metres. Installing large retaining walls or drainage systems often requires this type of excavation.
  • Mobile plant: Using machinery like bobcats, excavators, skid steers, or scissor lifts where they may overturn or the operator has restricted visibility.
  • Falling objects: Work where there is a risk of objects falling on a person, such as pruning large trees or lifting heavy pavers over a work area.
  • Structural work: Work that involves structural alterations or repairs that require temporary support to prevent collapse.
  • Work near traffic: If you are landscaping on a road reserve or near a roadway without traffic control.
  • Work in or near water: Constructing water features or working near dams or rivers where there is a drowning risk.

You also need to use this document for work that involves asbestos removal, work in confined spaces, or work on or near pressurised gas distribution mains or piping.

If you are hiring subcontractors for these tasks, you must ensure they have their own compliant SWMS. As the principal contractor on a commercial site, you must not allow the work to proceed until you have reviewed and accepted their SWMS. If you are working on a domestic project where the client is managing the work, you still need to provide your SWMS to the client before you start.

Key Sections and Required Elements

A compliant SWMS cannot be a blank sheet of paper. The law sets out specific content that must be included under Regulation 291 of the WHS Regulations. If your document misses these elements, it is considered non-compliant, and you could face fines or stop-work orders.

The High Risk Construction Work Statement

The document must clearly state that the work involves high-risk construction work. It should identify the specific risks involved. For example, if you are building a timber retaining wall, the statement must acknowledge the risk of excavation collapse and the use of heavy timber loads.

Hazards and Risks

You must list all hazards associated with the work and the risks arising from those hazards. In landscaping, this goes beyond just "heavy lifting." You need to consider noise, vibration, ultraviolet (UV) radiation, manual handling, underground services, and exposure to chemicals.

Control Measures

This is the core of the document. You must describe the control measures that will be used to eliminate or minimise the risks. You must also describe how these measures will be implemented, monitored, and reviewed. Vague statements like "be careful" are not acceptable. You need specific actions, such as "Use a spotter when the excavator is reversing."

Hierarchy of Controls

Your control measures should follow the Hierarchy of Controls. This means you should first try to eliminate the hazard. If you cannot, you should substitute it, isolate it, or use engineering controls. You should rely on administrative controls and Personal Protective Equipment (PPE) only as a last resort. Relying solely on PPE is often a sign of poor safety planning.

Emergency Procedures

The SWMS should outline what to do in an emergency. This includes the location of first aid kits, emergency contact numbers, and the assembly point.

Worker Signatures

There must be a declaration section. This is where the Principal Contractor, Site Supervisor, and the workers carrying out the work sign off. They are confirming that they have read and understood the document. This sign-off must happen before the work commences.

How to Write a Landscaper SWMS (Step by Step)

Writing a SWMS is a collaborative process. You cannot simply sit in the office and write it alone. The law requires you to consult with your workers. They are the ones on the tools and they often know the risks better than anyone else.

Step 1: Identify the High Risk Work

Review the job scope and determine which parts of the job are classified as High Risk Construction Work. Look at the 18 specific activities listed in the regulations. If you are digging a trench for a soakwell, check if it will be deeper than 1.5 metres. If yes, you need a SWMS.

Step 2: Consult with Your Team

Gather your crew and talk through the job. Ask them what they think might go wrong. In the landscaping industry, experienced workers will point out issues like soft ground under the excavator or hidden rocks that might cause the machine to tip. This consultation step is a legal requirement under Section 47 of the WHS Act.

Step 3: Break Down the Job Steps

List the job in a logical sequence. Do not just write "Build Retaining Wall." Break it down:

  1. Site set-up and exclusion zone.
  2. Excavation.
  3. Delivery of materials.
  4. Installation of sleepers.
  5. Backfilling and compaction.

Step 4: Identify Hazards and Assess Risks

For each step, write down the hazards.

  • Excavation: Underground cables (electrocution), trench collapse (crushing).
  • Delivery: Slabs falling off truck (crushing).
  • Installation: Manual handling of heavy sleepers (musculoskeletal injury).

Step 5: Select Control Measures

Apply the Hierarchy of Controls to each hazard.

  • Underground cables: Eliminate the risk by using "Dial Before You Dig" plans. Use an excavator fitted with a non-destructive digging tool (potholing).
  • Trench collapse: Use engineering controls like trench shields or battering the sides to a safe angle.
  • Manual handling: Use mechanical aids like a bobcat to move sleepers, or share the load between two workers.

Step 6: Define Implementation

Write down exactly how the controls will be used. Who checks the Dial Before You Dig plans? Who stands in the exclusion zone while the machine is operating? How will you ensure the trench batter does not get too steep during the day?

Step 7: Review and Sign

Once the draft is complete, take it back to the workers. Make sure they agree that the controls are practical. Then, have everyone sign the document. This confirms they have been consulted and they understand their safety duties.

Step 8: Keep it Accessible

The SWMS must be kept at the workplace where the work is being carried out. If it is reasonably practicable to do so, it should be on site. If you are moving around a large property, keep a copy in the ute or have it available on a tablet. It must be easy for inspectors or workers to read.

Common Mistakes to Avoid

Many businesses treat the SWMS as a "tick and flick" exercise. This is a dangerous practice and regulators are cracking down on it. Avoiding these common mistakes will keep you compliant and, more importantly, keep your crew safe.

Using Generic Templates Without Customisation

It is common practice to use a "Master" or "Generic SWMS" for routine tasks like operating a mini-excavator. However, you must append a "Site-Specific Addendum" for each new job. A generic document does not account for the slope of the land, the proximity of children in a backyard, or specific underground services. If you use a generic SWMS for a complex job without modifying it, regulators can issue on-the-spot fines.

Failing to Identify All Hazards

Some SWMS focus only on the obvious risks like excavations or heights. They forget about environmental hazards common in landscaping, such as heat stress, UV exposure, noise from machinery, and dust. A good SWMS covers all risks, not just the ones that trigger the legislation.

Vague Control Measures

Avoid writing "Wear PPE" as your only control. While PPE is important, it is the lowest level of control. A regulator will want to see how you plan to stop the accident from happening in the first place. Instead of just "Wear ear muffs," specify "Use the electric breaker instead of the petrol breaker to reduce noise levels."

Not Keeping the Document on Site

You cannot leave the SWMS in the office. The regulations require it to be readily accessible. If an inspector visits your site and you cannot produce the SWMS immediately, you are breaching the law.

Ignoring Changes on Site

If conditions change, the SWMS must be reviewed. If you start digging and find an old concrete tank that was not on the plans, you must stop work. You need to reassess the risks, update the SWMS to include the new hazard, and consult with your team before continuing. Using an old SWMS for a changed work environment is a major compliance failure.

Legal Considerations (AU)

Operating a landscaping business in Australia requires a solid understanding of safety law. The regulatory environment is strict, and the penalties for non-compliance are severe. While most states follow the Model WHS laws, there are some variations you need to know.

The WHS Harmonised Laws

The Commonwealth, New South Wales, Queensland, South Australia, Tasmania, and the Australian Capital Territory all operate under the Model WHS laws. The Work Health and Safety Act 2011 and the Work Health and Safety Regulations 2011 set the standard. Under these laws, a PCBU has a primary duty of care to ensure, so far as is reasonably practicable, the health and safety of workers.

Victorian Variations

Victoria operates under its own legislation, the Occupational Health and Safety Act 2004 (Vic). While the principles are similar, the terminology differs. Victoria requires a Job Safety Analysis (JSA) or a Method Statement for specific high-risk activities. These function similarly to an SWMS but are governed by the Occupational Health and Safety Regulations 2017 (Vic), specifically Part 5.3 (Construction). If you work in Victoria, ensure your documents align with WorkSafe Victoria’s requirements.

Western Australian Updates

Western Australia has recently adopted the Work Health and Safety Act 2020 (WA), which has largely harmonised with the national standard. If you are operating in WA, you need to ensure your SWMS meets these new national standards, as they have replaced older OHS regulations.

Duty to Consult

The WHS Act mandates consultation. Section 47 requires PCBUs to consult with workers who are likely to be directly affected by a matter relating to work health or safety. Writing a SWMS in isolation is a breach of this duty. You must have evidence that workers were involved in the process.

Principal Contractor Requirements

On commercial construction sites, the Principal Contractor has specific responsibilities. They must not give a direction to a contractor to carry out HRCW unless the contractor has provided the SWMS and the Principal has reviewed it. If you are the landscaper acting as a contractor, you must provide your SWMS to the Principal Contractor well before the start date.

Incident Notification and Due Diligence

If a serious incident occurs, such as a death or serious injury, it is a "Notifiable Incident" under the WHS Act. You must notify the regulator immediately. The SWMS will form a crucial part of the evidence chain during the investigation. Furthermore, under the Corporations Act 2001, company officers have a duty to exercise due diligence. This means they must actively ensure the business complies with WHS laws. A signed, site-specific SWMS is a key piece of evidence that officers have fulfilled this duty.

Relevant Australian Standards

To ensure your control measures are up to standard, you should reference relevant Australian Standards in your SWMS. These standards provide the technical benchmarks for safe work.

  • AS 3012: Electrical installations - Construction and demolition sites. This is critical when working near underground or overhead power lines.
  • AS/NZS 1576: Scaffolding series. If you are using scaffolding to access a high wall for trimming or rendering.
  • AS 2158: Guide to scaffolding.

Using these standards in your document shows that you are following industry best practice.

Frequently Asked Questions

Can I write one SWMS for the whole year?

No, a SWMS must be specific to the work being done. While you can have a generic document for common tasks like mowing or paving, you must add site-specific information for every new location. A SWMS written for a flat backyard is not suitable for a steep block with retaining walls.

Who is responsible for the SWMS?

The Person Conducting a Business or Undertaking (PCBU) is responsible. If you are a subcontractor, you are responsible for your own SWMS. If you are the employer, you are responsible for ensuring the document is created and followed.

Do I need a SWMS for work involving chemicals?

Not necessarily. The WHS Regulations specifically list the 18 High Risk Construction Work activities. General chemical handling, like spraying herbicides, usually requires a Safety Data Sheet (SDS) and safe work procedures. However, if the chemical work involves a risk of explosion or structural damage, it may trigger the SWMS requirement.

How long do I need to keep the SWMS?

You must keep the SWMS while the work is being carried out. It is best practice to keep it for at least 2 years after the work is completed, as regulators may investigate incidents after the fact.

Can I buy a SWMS template?

Yes, you can use a template as a starting point. However, you must fill it out yourself to ensure it is specific to your site and your workers. Buying a pre-filled document that says "insert job name here" and using it without modification is a breach of the law.

Is a toolbox talk enough?

No. A toolbox talk is a short meeting to discuss safety. It should be used to reinforce the contents of the SWMS, not replace it. Best practice is to use the SWMS as the agenda for your morning toolbox talk.

Does a SWMS need to be signed?

Yes. The regulations require that the Principal Contractor (if applicable), the Site Supervisor, and the workers all sign the SWMS to confirm they have read and understood it.

Key Facts

  • A Person Conducting a Business or Undertaking must prepare a SWMS before High Risk Construction Work begins.Work Health and Safety Regulations 2011 (Cth)
  • Regulation 291 of the WHS Regulations mandates specific content that must be included in a SWMS for it to be compliant.Work Health and Safety Regulations 2011 (Cth)
  • Excavation work involving trenches deeper than 1.5 metres requires a SWMS.Work Health and Safety Regulations 2011 (Cth)
  • Principal contractors on commercial sites must not allow high-risk work to proceed until they have reviewed and accepted the subcontractor's SWMS.Work Health and Safety Act 2011
  • Control measures within a SWMS must follow the Hierarchy of Controls, prioritizing elimination over Personal Protective Equipment.Work Health and Safety Regulations 2011 (Cth)
  • Using mobile plant like excavators where there is a risk of overturning requires a SWMS.Work Health and Safety Regulations 2011 (Cth)
  • A SWMS serves as evidence that a PCBU has met their primary duty of care under the WHS Act.Work Health and Safety Act 2011

Sources

Required Sections

Job Details and Scope of Work

Records the project name, site address, landscaping contractor details, and a description of the landscaping work.

Required

High-Risk Construction Work Identification

Identifies applicable high-risk construction work categories for landscaping tasks.

Required

Hazard Identification

Identifies landscaping-specific hazards including machinery, excavation, and environmental risks.

Required

Risk Assessment and Control Hierarchy

Applies the hierarchy of controls to each identified landscaping hazard.

Required

Safe Work Procedures

Step-by-step safe work procedures for common landscaping tasks.

Required

Personal Protective Equipment Requirements

Lists all required PPE for landscaping work.

Required

Emergency Procedures

Outlines emergency response procedures for landscaping incidents.

Required

Ready to create your document?

Use our free template or generate a custom version tailored to your needs.

Use Free Template
Create your custom version — free to start

20 free credits on signup — no card needed

This document involves significant legal or financial considerations. Professional review is strongly recommended.

Last reviewed: July 27, 2026