PropoDoc provides self-help document templates and tools. It is not a law firm and does not provide legal advice. Learn more.
Skip to main content
Example
form

Return to Work Plan Example

Example document for Return to Work Plan. Use this as a reference when creating your own.

Professional Review Required

This document involves significant legal, financial, or compliance considerations. You must have a qualified professional review and approve this document before use. Do not rely on this template as legal advice.

Document: Return to Work Plan

Example Document

Last updated 7/27/2026

Return to Work Plan

Employer Details

  • Business Name: Smith & Sons Plumbing
  • ABN: 12 345 678 901
  • Contact Person: John Smith
  • Phone Number: 0412 345 678
  • Date of Plan: 15/10/2023

Worker Details

  • Worker Name: Michael Jones
  • Job Title: Plumber
  • Date of Injury: 01/09/2023
  • Date of Commencement of this Plan: 16/10/2023
  • Expected Date of Full Return to Work: 01/12/2023

1. Medical Information

Treating Doctor: Dr. Sarah Lee

  • Medical Practice: City Medical Centre
  • Date of Certificate of Capacity: 14/10/2023

Current Capacity:

  • Fit for pre-injury duties? No
  • Fit for suitable duties? Yes
  • Work Hours Capacity: 5 hours per day, 4 days per week

Restrictions / Limitations:

  • No lifting heavier than 10kg.
  • No repetitive twisting of the lower back.
  • No working in deep trenches or confined spaces.
  • Must take a 10-minute break every hour for stretching.

2. Proposed Suitable Duties

Position Title for Suitable Duties: Workshop and Inventory Coordinator

Hours of Work:

  • Start Time: 7:00 AM
  • Finish Time: 12:00 PM
  • Days: Monday to Thursday
  • Total Hours per Week: 20

Duties and Tasks:

Task DescriptionEstimated TimeFrequencySupervision Required
Organising and inventorying van stock2 hoursDailyYes - Initial oversight
Ordering parts via supplier portals1 hourDailyNo
Assembling small pipe kits (sitting)1 hourDailyNo
Answering client service calls1 hourDailyNo

3. Workplace Modifications and Support

Modifications Required:

  • A sturdy chair with back support has been placed at the workbench.
  • All heavy inventory items have been moved to waist-height shelves.

Equipment Provided:

  • Dolly for moving boxes of fittings (eliminates lifting).

Training Required:

  • Review of updated inventory software system.

Support Person:

  • Name: David Brown (Workshop Manager)
  • Role: Oversees duties and ensures restrictions are followed.

4. Monitoring and Review

Review Dates:

  • First Review: 30/10/2023
  • Second Review: 13/11/2023

Key Performance Indicators for Recovery:

  • Michael reports no increase in pain levels after two weeks.
  • Increase work hours to 6 hours per day starting 06/11/2023.

Plan Graduation:

  • Michael will try a half-day site visit with supervision on 20/11/2023.

5. Agreement and Signatures

Employer Representative: Signature: [John Smith Signature] Name: John Smith Date: 15/10/2023

Worker: Signature: [Michael Jones Signature] Name: Michael Jones Date: 15/10/2023

Notes

This example shows a trade business owner helping a plumber with a back injury. The plan removes physical risks like heavy lifting and trench work. It replaces them with sedentary or light duties in the workshop. The plan includes specific hours and tasks. It also names a support person to monitor the situation. The review dates ensure the plan is updated as the worker recovers.

About this Example

Part of the Return to Work Plan document collection

Document Type

Return to Work Plan

A formal written agreement between an employer and worker outlining the steps for an employee to return to work safely after an injury or illness. It helps manage duties, hours, and support while meeting Australian legal obligations.

Complexity

moderate

Risk Level

high