Safe Work Method Statement (Non-High-Risk) Example

Example document for Safe Work Method Statement (Non-High-Risk). Use this as a reference when creating your own.

For Informational Purposes

This document template is provided for informational purposes. Customize it for your specific needs.

Document: Safe Work Method Statement (Non-High-Risk)

Example Document

Last updated 7/29/2026

Company Details

Company Name: Peak Electrical Services ABN: 12 345 678 901 Address: 42 Sparks Lane, Melbourne VIC 3000 Phone: 03 5555 1234 Email: admin@peakelectrical.com.au

Project Details

Project / Site Name: Office Fitout Lighting Upgrade Site Address: Level 2, 100 Bourke Street, Melbourne VIC 3000 Client Name: City Real Estate Pty Ltd Date of Issue: 12 October 2023

Job Description

Installation of 20 new LED pendant lights in the open plan office area. Work involves minor ladder work, wiring to existing ceiling circuits, and removal of old fluorescent tubes.

Persons Responsible

Project Manager / Supervisor: John Smith Contact Number: 0400 000 000

Hazards and Controls

Job StepPotential HazardsRisk RatingControl MeasuresPerson Responsible
1. Set up work area & laddersTripping over tools, falling off ladderMediumKeep cords taped down, use ladder standoff, maintain 3 points of contact on ladder, ensure ladder base is levelJohn Smith
2. Isolate power supplyElectric shock, arc flashHighLock out / Tag out procedure at switchboard, test for dead before touching wires, use insulated glovesLicensed Electrician
3. Remove old fittingsEye injury from glass, manual handlingLowWear safety glasses, lift with knees not back, dispose of tubes in designated binApprentice
4. Install new fittingsElectric shock, falling objectsMediumUse RCD on leads, do not work directly under other workers, wear hard hat if overhead risk existsLicensed Electrician
5. Testing and commissioningElectric shockMediumKeep area clear while testing, only authorised personnel to switch power back onJohn Smith

Safety Equipment and PPE

  • Safety Helmet
  • Safety Glasses
  • High Visibility Clothing
  • Safety Boots
  • Hearing Protection
  • Gloves (Insulated)
  • Dust Mask

Plant and Equipment

  • 2.4m Fibreglass Ladder
  • Cordless Drill
  • Multimeter
  • Lock Out / Tag Out Kit
  • RCD Powerboard

Pre-Start Checklist

  • Workers briefed on this SWMS
  • Emergency contact numbers confirmed
  • First aid kit located and accessible
  • Site amenities available
  • Site induction completed

Sign Off

Worker NameWorker SignatureDate
John SmithJ. Smith12/10/2023
Mike JonesM. Jones12/10/2023

Supervisor Signature: J. Smith Date: 12/10/2023

Notes

Notes on the Example:

  1. Specificity: The job description clearly states the location and the specific task (LED lighting upgrade).
  2. Risk Ratings: The 'Isolate power supply' step is correctly identified as High risk, leading to stricter control measures like Lock Out / Tag Out.
  3. Hierarchy of Controls: Controls include engineering (RCD) and administrative (testing for dead) measures, not just PPE.
  4. PPE Relevance: Only relevant PPE is selected. For example, hearing protection is not checked because the work is not loud.
  5. Responsibility: Specific roles (Licensed Electrician vs Apprentice) are assigned to steps to ensure competency.

About this Example

Part of the Safe Work Method Statement (Non-High-Risk) document collection

Document Type

Safe Work Method Statement (Non-High-Risk)

A written plan that outlines the steps for doing a job safely. It identifies hazards and sets out control measures for work that is not classified as high risk.

Complexity

moderate

Risk Level

low