PropoDoc provides self-help document templates and tools. It is not a law firm and does not provide legal advice. Learn more.
Skip to main content
Example
form

SWMS - Air Conditioning Installer (Split System) Example

Example document for SWMS - Air Conditioning Installer (Split System). Use this as a reference when creating your own.

Professional Review Required

This document involves significant legal, financial, or compliance considerations. You must have a qualified professional review and approve this document before use. Do not rely on this template as legal advice.

Document: SWMS - Air Conditioning Installer (Split System)

Example Document

Last updated 7/30/2026

JOB DETAILS

Company Name: Cool Air Solutions Pty Ltd ABN: 12 345 678 901 Job Title / Address: 42 Smith Street, Parramatta NSW Date of Work: 12/10/2023 Supervisor Name: John Smith

TASK DESCRIPTION

Scope of Works: Install a Daikin 5kW Split System. Indoor unit to be mounted on living room wall. Outdoor unit to be mounted on brackets on the external brick wall at 3.5m height. Electrical work to be performed by qualified electrician.

HAZARDS AND RISKS (Excerpt)

High Risk Construction ActivityHazard/sRiskControls
Working at HeightsFall from ladder while mounting outdoor unit.Death1. Use a 3m elevated work platform (EWP) instead of ladder. <br> 2. EWP operator to hold Yellow Card. <br> 3. Wear full body harness clipped in while in basket.
Manual HandlingLifting 35kg outdoor unit into EWP basket.Back Injury1. Use a pulley system to lift unit from ground to EWP. <br> 2. Two workers to guide the load.
Electrical Work240V Shock.Death1. Power isolated at meter box. <br> 2. Danger tag installed. <br> 3. Proven dead using multimeter.

SAFE WORK METHOD (Excerpt)

Step 4: Mounting Outdoor Unit

  1. Position EWP near the wall mounting site.
  2. Operator puts on harness and inspects EWP.
  3. Worker raises to working height.
  4. Ground worker attaches lifting straps to outdoor unit.
  5. Worker in EWP pulls unit up using pulley.
  6. Worker guides unit onto pre-installed brackets.
  7. Secure unit with bolts.

SIGN OFF

Worker NameSignatureDate
M. JonesM.Jones12/10/23
B. LeeB.Lee12/10/23

Notes

In this example, the risk of working at heights was mitigated by substituting the ladder with an Elevated Work Platform (EWP). This is a higher order control than using a ladder with a stabiliser. The manual handling risk was reduced by using a pulley system.

About this Example

Part of the SWMS - Air Conditioning Installer (Split System) document collection

Document Type

SWMS - Air Conditioning Installer (Split System)

This SWMS is required for installers mounting split system air conditioning units. It covers high-risk construction work including working at heights, electrical work, and manual handling.

Complexity

complex

Risk Level

high