Document: SWMS - Bricklayer / Blocklayer

Example Document

Last updated 7/30/2026

SAFE WORK METHOD STATEMENT (SWMS)

Company Details

Company Name: Apex Bricklaying Pty Ltd ABN: 12 345 678 901 Address: 123 Build Road, Melbourne VIC 3000

Project / Job Details

Site Address: 45 Smith Street, Richmond VIC Job Title: Single Storey Dwelling Brickwork Date of Work: 15/10/2023 SWMS Number: SWMS-004

High Risk Construction Work (HRCW)

  • Work involving a risk of a fall over 2 metres
  • Work carried out on or near energised electrical installations
  • Work involving the use of powered mobile plant

Sign-Off (Preparation)

Principal Contractor / PCBU Representative: J. Smith Date: 14/10/2023 Signature: J. Smith

1. Job Steps / Tasks

StepDescription of Task
1Site set up, perimeter fencing and hazard signs
2Delivery and loading of bricks onto scaffolding using telehandler
3Mixing mortar in portable mixer
4Laying bricks on external walls at 3m height
5Cutting bricks with angle grinder for corners
6Installation of window lintels

2. Hazards, Risks and Control Measures

Job StepHazard(s)Potential HarmRisk (Before)Control MeasuresRisk (After)
1Uneven ground, debrisSprains, cutsMAdmin: Inspect ground daily. Clean area. PPE: Boots.L
2Telehandler collision, falling bricksCrush injury, fracturesHEngineering: Use telehandler with spotter. Scaffold tagged. Do not overload bays. Admin: Exclusion zone for loading. PPE: Hi-vis vest, helmet.L
3Silica dust, cement burnsSilicosis, dermatitisHEngineering: Wet mixing. Keep mixer lid on. Admin: Work upwind. PPE: P2 mask, goggles, gloves.L
4Fall from scaffoldSerious injury / DeathHSubstitution: Use full scaffold (no ladders). Engineering: Scaffold 2.4m high with handrails and toe boards (AS 1576). Admin: Tag visible. PPE: Boots.L
5Noise, dust, kickbackHearing loss, eye injuryHEngineering: Wet cutting with dust attachment. Admin: Isolate cutting. PPE: Class 5 muffs, P2 mask, face shield.L
6Heavy liftingBack injuryMEngineering: Use brick tongs or two-man lift for heavy lintels. Admin: Keep load close to body.L

3. Personal Protective Equipment (PPE)

  • Safety Helmet (Viking)
  • High Visibility Clothing (Orange Shirt)
  • Safety Boots (Steel Cap)
  • Safety Glasses (Clear)
  • Hearing Protection (Class 5 Earmuffs)
  • Dust Mask (P2)
  • Sun Protection (Hard hat brim)
  • Gloves (Rubber)

4. Emergency Procedures

Emergency Services: 000 Nearest Hospital: Epworth Richmond Emergency Assembly Point: Front footpath

5. Training and Competency

  • General Construction Induction Card (White Card) - All workers
  • Site Specific Induction - All workers
  • High Risk Work License (Scaffolding) - Scaffolder hired
  • High Risk Work License (Forklift/Telehandler) - Bob Jones

6. Review and Monitoring

Last Review Date: 14/10/2023 Next Review Date: 14/10/2024

7. Worker Sign-Off

Worker NameSignatureDate
B. Brick15/10/23
A. Layer15/10/23

Notes

This example assumes a standard residential project using a telehandler and scaffold. It highlights the high-risk activities of working at heights and using mobile plant.

About this Example

Part of the SWMS - Bricklayer / Blocklayer document collection

Document Type

SWMS - Bricklayer / Blocklayer

This SWMS is required for all bricklaying and blocklaying work on Australian construction sites that involves high-risk construction work, such as working at heights over 2 metres or using powered mobile plant.

Complexity

complex

Risk Level

high