SWMS - Bridgeworks Example

Example document for SWMS - Bridgeworks. Use this as a reference when creating your own.

Professional Review Required

This document involves significant legal, financial, or compliance considerations. You must have a qualified professional review and approve this document before use. Do not rely on this template as legal advice.

Document: SWMS - Bridgeworks

Example Document

Last updated 7/30/2026

COMPANY DETAILS

Company Name: Bridge Masters Pty Ltd ABN: 12 345 678 901 Address: 10 Build Way, Sydney NSW

PROJECT / JOB DETAILS

Project Name: Riverside Bridge Repair Site Address: Main Street, over Parramatta River Client: RMS (Roads and Maritime Services) Date of Work: 15/10/2023 to 20/10/2023

TASK BREAKDOWN

  1. Erection of suspended scaffold
  2. Concrete jackhammering (bridge deck)
  3. Steel girder repair (welding)
  4. Working over water (marine operations)

HAZARD IDENTIFICATION AND RISK ASSESSMENT

High Risk Construction ActivityHazardsRisksInitial RatingControl MeasuresResidual Rating
Erection of scaffoldFalling from height, falling objectsSerious injury / DeathHighFull harness with 2m lanyard, scaff tags, exclusion zone belowLow
Concrete jackhammeringNoise, vibration, silica dustHearing loss, HAVS, SilicosisHighWet cutting, vac attachment, ear muffs, respirator P2Low
Working over waterDrowning, falling into riverDeathHighSafety net installed, life jackets worn, rescue boat on standbyLow

HIERARCHY OF CONTROLS

1. Elimination: Not possible, repair must be done over water. 2. Substitution: Used lightweight vacuum attachment instead of heavy manual sweeping. 3. Engineering: Installed catch platforms under bridge deck. Guard rails on scaffold. 4. Administrative: 15-minute rest breaks every hour for jackhammering. Tool box talk every morning. 5. PPE: Hard hat, hi-vis vest, steel caps, glasses, hearing muffs, life jacket.

EMERGENCY PROCEDURES

Emergency Services: 000 Site Emergency: John Smith (Site Manager) - 0412 345 678

Man Overboard Procedure: Stop work immediately. Throw life buoy. Alert rescue boat skipper. Do not jump in after victim unless fully trained and equipped.

SIGN-OFF

Site Manager: J. Smith (Signed)

Workers: B. Jones, M. Brown, A. Wilson, D. Miller (All Signed)

Notes

This example shows a simplified view. In a real scenario, the 'Control Measures' column would list exact steps, not just a summary. It also assumes the bridge is over water, requiring specific marine safety controls.

About this Example

Part of the SWMS - Bridgeworks document collection

Document Type

SWMS - Bridgeworks

This SWMS is required for all construction, repair, and maintenance work on bridges. It covers high-risk activities like working at heights, near water, and using mobile plant.

Complexity

complex

Risk Level

high