SWMS - Ceiling Fixer Example

Example document for SWMS - Ceiling Fixer. Use this as a reference when creating your own.

Professional Review Required

This document involves significant legal, financial, or compliance considerations. You must have a qualified professional review and approve this document before use. Do not rely on this template as legal advice.

Document: SWMS - Ceiling Fixer

Example Document

Last updated 7/30/2026

SAFE WORK METHOD STATEMENT (SWMS)

Company / Project Details

Company Name: Apex Ceilings Pty Ltd ABN: 12 345 678 901 Site Address: 45 Build Road, Parramatta NSW Date of Preparation: 12/10/2023

Job / Task Description

Task Title: Suspended Ceiling Installation - Office Block Level 3 Location of Work: Level 3, West Wing Date of Work: 15/10/2023 to 20/10/2023

Description of Work: Installation of 1200mm x 600mm suspended mineral fibre ceiling tiles in office suites 301-305. Work involves fixing galvanised steel grid runners, cutting tiles to fit around ducts, and levelling the grid. Work height is approximately 2700mm from finished floor level.

Persons Responsible

Principal Contractor / PCBU: Build Co Construction Supervisor: John Smith Mobile: 0412 345 678

Step 1: Hazards and Risks

Task / StepHazardRiskPotential HarmHML
Loading materials on lift siteOverhead load fallingCrush injuryFracturesX
Moving ceiling tilesManual handlingStrainBack injuryX
Installing grid from ladderFalls from heightFallFractures / DeathX
Cutting mineral tilesFibre dustIrritationRespiratory issuesX
Using power drillNoiseHearing lossTinnitusX

Step 2: Control Measures

Task / StepControl Measures (Hierarchy of Controls)WhoWhen
Loading materials1. Use mechanical lift. 2. Exclude area below load. 3. Use tag lines. 4. Wear hard hat.DogmanAlways
Manual handling1. Store trolley close to work. 2. Limit tiles carried to 2 at a time. 3. Use bent knees and straight back technique.InstallerAlways
Work at heights1. Use mobile scaffold tower ( tagged) instead of ladder. 2. Maintain 3 points of contact. 3. Ensure scaffold is on level ground and wheels locked.InstallerAlways
Dust control1. Cut tiles in well ventilated area. 2. Use sharp knife to minimise dust. 3. Wear P2 disposable mask.InstallerAlways
Power tools1. Use RCD protected box. 2. Test RCD daily. 3. Wear ear muffs Class 4.InstallerAlways

Step 3: Personal Protective Equipment (PPE)

  • Safety Helmet (Class 2)
  • High Visibility Shirt
  • Safety Boots
  • Safety Glasses
  • Gloves (not required for this specific task)
  • Hearing Protection
  • Dust Mask (P2)
  • Safety Harness (Scaffold used instead)

Step 4: Emergency Procedures

Emergency Contact: 000 First Aid Officer: Sarah Lee - 0422 999 888 Nearest Hospital: Westmead Hospital Assembly Point: Front Car Park (Northern end)

Step 5: Worker Sign-off

NameSignatureDate
M. Jones[Signed]15/10/2023
T. Nguyen[Signed]15/10/2023
J. Smith[Signed]15/10/2023

Step 6: Review

No changes to work method since preparation. SWMS remains valid.

Notes

This example demonstrates a completed SWMS for a specific ceiling job. It highlights how the hierarchy of controls is applied by selecting scaffolding over ladders to reduce the risk of falls.

About this Example

Part of the SWMS - Ceiling Fixer document collection

Document Type

SWMS - Ceiling Fixer

This SWMS is required for any high-risk construction work involving fixing ceilings. It applies when working at heights over two metres, using powered mobile plant, or installing suspended ceiling systems.

Complexity

complex

Risk Level

high