Example document for SWMS - Deck Builder. Use this as a reference when creating your own.

Professional Review Required

This document involves significant legal, financial, or compliance considerations. You must have a qualified professional review and approve this document before use. Do not rely on this template as legal advice.

Document: SWMS - Deck Builder

Example Document

Last updated 7/30/2026

Safe Work Method Statement (SWMS)

Company/Business Name: Apex Decks Pty Ltd ABN: 12 345 678 901 Job Title: Elevated Timber Deck Construction Location of Works: 42 Harbour View Rd, Mosman NSW Date Prepared: 12/10/2023 Date of Review: 12/04/2024

1. Details of High-Risk Construction Work

Is this High-Risk Construction Work? YES Note: Work involves a fall risk of 3.5 metres.

Description of Work: Construction of a 6m x 4m elevated timber deck at the rear of the residence. The deck is 3.5m above ground level on a sloping block. Materials are treated pine and merbau decking. Access is via a side pathway 1.2m wide.

Site Specifics:

  • Ground Conditions: Steep grassed slope, clay soil.
  • Public Access: Rear boundary adjoins a public park pathway.
  • Overhead Hazards: None.
  • Underground Services: Ref #12345 (Telstra cable found 1.5m left of stump hole A).

2. Persons Responsible

Principal Contractor: John Smith Site Supervisor: Sarah Jones Emergency Contact: John Smith - 0412 345 678

3. Hazard Identification and Risk Assessment

Job Step / TaskPotential HazardsRisks (H/M/L)Existing ControlsInitial Risk Rating (H/M/L)
Excavationservices hit, slips on slopeelectrocution, fracturesPOCKETS, safe access trackL
Setting Stumpsmanual handling, concrete splashback injury, burns2 person lift, PPEM
Bearers & Joistsfall from height, drop objectfatality, head injuryMobile scaffold, hard hatsH
Nailing Deckrecoil, eye injurypuncture, blindnesssequential trigger, glassesM

4. Control Measures

Hierarchy of Controls

1. Elimination: Pre-cut timber lengths to reduce work at height.

2. Substitution: Use 90x45mm joists instead of 140x45mm where possible to reduce weight.

3. Engineering:

  • Use 2.5m mobile scaffold towers with outriggers for bearer installation.
  • Install temporary edge protection (timber pickets and plastic mesh) along the bearers before laying joists.

4. Administrative:

  • Toolbox talk at 7:00am daily.
  • No work alone on the site.
  • Keep gate to public park locked during deliveries.

5. Personal Protective Equipment (PPE):

  • Type 1 Safety Helmet, Orange Hi-Vis Shirt, Steel Cap Boots, Safety Glasses, Class 5 Ear Muffs, Sunscreen.

5. Safe Work Method Sequence

Step 1: Site Setup

  1. Place warning signs at front gate.
  2. Lock side gate leading to park.
  3. Set up mobile scaffolds on level pads (using rubber mats).

Step 2: Bearers

  1. Two workers to lift bearer onto scaffolding.
  2. Secure bearer to posts using structural screws while standing on scaffold deck.

Step 3: Joists

  1. Lift joists individually.
  2. Fix joist hangers from scaffold.
  3. Install temp edge protection to outer joist immediately.

Step 4: Decking

  1. Work from the scaffold deck or from the already laid decking area.
  2. Never stand on bare joists without fall protection.
  3. Use pneumatic nailer with single shot trigger.

6. Emergency Procedures

Fire: Water hydrant located at front nature strip. Assembly at mailbox. First Aid: Kit located in site van. Serious Injury: Call 000. Ambulance entry via front driveway.

9. Sign-Off

Worker NameSignatureDate
Sarah JonesS.Jones12/10/23
Mike BrownM.Brown12/10/23

Principal Contractor: Name: John Smith Signature: J.Smith Date: 12/10/23

Notes

This example shows a completed SWMS for a high-risk deck job. Note the specific site details about the slope and public park. The controls mention specific equipment like mobile scaffold and temporary edge protection. The sign-off section is filled out.

About this Example

Part of the SWMS - Deck Builder document collection

Document Type

SWMS - Deck Builder

Use this Safe Work Method Statement for building residential and commercial timber, steel, or composite decks. It applies when working at heights over 2 metres.

Complexity

complex

Risk Level

high