SAFE WORK METHOD STATEMENT (SWMS)
Company / Project Details
Company Name: BuildRight Constructions Pty Ltd ABN: 12 345 678 901 Project Address: 45 Smith Street, Parramatta NSW Date of Preparation: 12/10/2023 Work Activity: Bricklaying - External Walls & BBQ Area
Step 1: Describe the High Risk Construction Work
| High Risk Construction Work Checklist | Yes/No |
|---|---|
| Work involving a risk of a person falling more than 2 metres | YES |
| Work carried out on or near pressurised gas distribution mains or piping | NO |
| Work carried out on or near chemical, fuel or refrigerant lines | NO |
| Work on or near energised electrical installations | NO |
| Work involving mobile plant | YES |
| Work in or near a confined space | NO |
| Work in or near a shaft or trench deeper than 1.5 metres | NO |
| Work involving demolition | NO |
| Work involving asbestos | NO |
| Work in an area that may have a contaminated or flammable atmosphere | NO |
| Work involving tilt-up or precast concrete | NO |
| Work in an area with movement of powered mobile plant | YES |
| Work on a telecommunications tower | NO |
| Work near traffic | NO |
Description of Work: Construction of external brick veneer walls for new dwelling and construction of a raised brick BBQ. Work includes scaffolding setup, mortar mixing, brick cutting, and laying bricks at heights up to 4 metres using a telescopic handler.
Step 2: Hazard Identification
| Step/Task | What is the Hazard? | How could it cause harm? | Risk Rating | Initial Controls |
|---|---|---|---|---|
| 1. Loading Bricks via Telehandler | Moving machinery, falling loads | Crushing | H | Dedicated spotters, exclusion zone (3m), operator ticket, green tag |
| 2. Manual Handling (Bundles) | Heavy lifting | Back strain | M | Use brick carts, lift in pairs, store at waist height |
| 3. Work on Scaffolding | Fall from height (4m) | Death/Spinal injury | H | Full scaffold (tagged), guardrails, access ladder, MW induction |
| 4. Cutting Bricks with Drop Saw | Silica dust, noise | Silicosis, hearing loss | H | Wet cutting on bench, P2 mask, ear muffs, wash down area |
| 5. Falling Objects | Loose bricks/tools | Head injury | H | Toe boards on scaffold, no throwing bricks, clean walkways |
| 6. Lime/Mortar Mixing | Cement burn | Dermatitis | M | Long sleeves, gloves, face shield, wash hands immediately |
| 7. Working in Heat | UV exposure, dehydration | Sunstroke, fatigue | M | Start at 6am, 10min break per hour, provide water station |
Step 3: Implementation of Control Measures
Key Task: Brick Cutting on Scaffolding
- Elimination: Not possible for this task.
- Substitution: Pre-cut bricks at ground level where possible to reduce height work.
- Isolation: Use a small wet-cut saw on the scaffold bay, ensure tarp is below to catch slurry.
- Engineering: Wet-cutting attachment connected to water supply. Use of RCD for saw power.
- Administrative: Only cut essential bricks. Clean slurry immediately (wet method).
- PPE: P2 respirator, safety glasses, ear muffs, nitrile gloves.
Key Task: Loading Materials
- Elimination: Delivery direct to scaffold by contractor.
- Engineering: Use of telescopic handler with brick grab.
- Administrative: Pedestrian exclusion zone enforced. Traffic controller present.
- PPE: High vis, steel caps, helmet.
Step 4: Personal Protective Equipment (PPE)
Minimum PPE:
- High visibility shirt (orange)
- Safety helmet (white)
- Safety boots (elastic sided)
- Safety glasses
- Broad brim hat
- Sunscreen (SPF 50+)
Task Specific:
- P2 Respirator (cutting)
- Ear muffs (cutting)
- Heavy duty gloves (handling)
- Long sleeve shirt (mixing/cutting)
Step 5: Emergency Procedures
Incident Reporting: Contact Site Foreman, John Smith, on 0400 123 456.
First Aid: Kit located in site office near amenities. Nearest Hospital: Westmead Hospital, Hawkesbury Rd, Westmead.
Fire: Call 000. Meeting point at the front gate (Smith Street).
Step 6: Review and Monitoring
Review Triggers:
- If weather becomes wet and slippery (scaffolding risk).
- If new machinery brought to site.
Review Date: 25/10/2023
Signatures
| Name | Role | Signature | Date |
|---|---|---|---|
| John Smith | Worker Rep | J.Smith | 12/10/23 |
| Mary Jones | PCBU | M.Jones | 12/10/23 |
| Steve Rogers | Worker | S.Rogers | 12/10/23 |
| Tony Stark | Worker | T.Stark | 12/10/23 |
Notes
Annotations: This example shows a practical application for a typical residential build. Note the inclusion of 'Wet cutting' as the primary control for silica dust, which is mandatory. The exclusion zones for the telehandler are clearly defined. The risk rating reflects the reality of working at height.
About this Example
Part of the SWMS - Masonry Worker (General) document collection
Document Type
SWMS - Masonry Worker (General)
Use this SWMS for general bricklaying, blockwork, and stone masonry tasks on construction sites. It covers high-risk work like working at heights, manual handling, and using powered tools.