PropoDoc provides self-help document templates and tools. It is not a law firm and does not provide legal advice. Learn more.
Skip to main content
Example
form

SWMS - Plasterboard Fixer Example

Example document for SWMS - Plasterboard Fixer. Use this as a reference when creating your own.

Professional Review Required

This document involves significant legal, financial, or compliance considerations. You must have a qualified professional review and approve this document before use. Do not rely on this template as legal advice.

Document: SWMS - Plasterboard Fixer

Example Document

Last updated 7/30/2026

COMPANY DETAILS

Company Name: ABC Gyprock Solutions Pty Ltd ABN: 12 345 678 901 Address: 1 Builder Street, Parramatta NSW Phone: 02 9000 1234

JOB / SITE DETAILS

Site Address: 45 Smith Street, Blacktown NSW Client Name: Westfield Developments Date of Work: 15 Oct 2023 to 20 Oct 2023 Principal Contractor: BuildCorp Constructions Project Supervisor: John Smith Task Description: Installation of 13mm wet area plasterboard to walls and 10mm board to ceilings in Level 1 units.

HAZARD IDENTIFICATION & RISK ASSESSMENT

Steps / Task DescriptionHazardsRisksInitial RatingControl MeasuresFinal Rating
1. Transporting 13mm boards to first floorManual handling, stairsBack strainH- Use hydraulic lift to hoist boards to balcony.<br>- Use 2 persons to carry sheets from lift to room.<br>- Clear stairs of debris.M
2. Fixing ceiling sheets at 3m heightFall from ladderFractured legH- Use mobile aluminium tower scaffold (1.2m high).<br>- Scaffolder licensed to erect tower.<br>- Tag scaffold inspected daily.<br>- Do not overreach from scaffold.L
3. Cutting board for openingsSilica dust, knife cutsEye injuryM- Wear P2 mask and safety glasses.<br>- Use storage board for cutting.<br>- Retract blade when not cutting.L

PPE CHECKLIST

  • Safety Helmet
  • High Vis Vest
  • Steel Cap Boots
  • Safety Glasses
  • Ear Plugs
  • P2 Mask

SIGN-OFF

I confirm I have read this SWMS.

Worker: M. Jones Date: 15/10/2023

Notes

This example demonstrates a completed section for a residential fit-out. Note how the 'Initial Rating' is High due to the fall risk, but the 'Final Rating' drops to Low because the control measure (Scaffolding) replaces the ladder.

About this Example

Part of the SWMS - Plasterboard Fixer document collection

Document Type

SWMS - Plasterboard Fixer

This SWMS is required for any work involving the installation of plasterboard, drylining, or ceiling systems where workers are exposed to the risk of falling more than two metres.

Complexity

complex

Risk Level

high