SWMS - Plasterboard Fixer Example
Example document for SWMS - Plasterboard Fixer. Use this as a reference when creating your own.
Professional Review Required
This document involves significant legal, financial, or compliance considerations. You must have a qualified professional review and approve this document before use. Do not rely on this template as legal advice.
Document: SWMS - Plasterboard Fixer
Example Document
Last updated 7/30/2026
COMPANY DETAILS
Company Name: ABC Gyprock Solutions Pty Ltd ABN: 12 345 678 901 Address: 1 Builder Street, Parramatta NSW Phone: 02 9000 1234
JOB / SITE DETAILS
Site Address: 45 Smith Street, Blacktown NSW Client Name: Westfield Developments Date of Work: 15 Oct 2023 to 20 Oct 2023 Principal Contractor: BuildCorp Constructions Project Supervisor: John Smith Task Description: Installation of 13mm wet area plasterboard to walls and 10mm board to ceilings in Level 1 units.
HAZARD IDENTIFICATION & RISK ASSESSMENT
| Steps / Task Description | Hazards | Risks | Initial Rating | Control Measures | Final Rating |
|---|---|---|---|---|---|
| 1. Transporting 13mm boards to first floor | Manual handling, stairs | Back strain | H | - Use hydraulic lift to hoist boards to balcony.<br>- Use 2 persons to carry sheets from lift to room.<br>- Clear stairs of debris. | M |
| 2. Fixing ceiling sheets at 3m height | Fall from ladder | Fractured leg | H | - Use mobile aluminium tower scaffold (1.2m high).<br>- Scaffolder licensed to erect tower.<br>- Tag scaffold inspected daily.<br>- Do not overreach from scaffold. | L |
| 3. Cutting board for openings | Silica dust, knife cuts | Eye injury | M | - Wear P2 mask and safety glasses.<br>- Use storage board for cutting.<br>- Retract blade when not cutting. | L |
PPE CHECKLIST
- Safety Helmet
- High Vis Vest
- Steel Cap Boots
- Safety Glasses
- Ear Plugs
- P2 Mask
SIGN-OFF
I confirm I have read this SWMS.
Worker: M. Jones Date: 15/10/2023
Notes
This example demonstrates a completed section for a residential fit-out. Note how the 'Initial Rating' is High due to the fall risk, but the 'Final Rating' drops to Low because the control measure (Scaffolding) replaces the ladder.
About this Example
Part of the SWMS - Plasterboard Fixer document collection
Document Type
SWMS - Plasterboard Fixer
This SWMS is required for any work involving the installation of plasterboard, drylining, or ceiling systems where workers are exposed to the risk of falling more than two metres.