PropoDoc provides self-help document templates and tools. It is not a law firm and does not provide legal advice. Learn more.
Skip to main content
Example
form

SWMS - Refrigeration Mechanic Example

Example document for SWMS - Refrigeration Mechanic. Use this as a reference when creating your own.

Professional Review Required

This document involves significant legal, financial, or compliance considerations. You must have a qualified professional review and approve this document before use. Do not rely on this template as legal advice.

Document: SWMS - Refrigeration Mechanic

Example Document

Last updated 7/30/2026

SAFE WORK METHOD STATEMENT (SWMS)

Company / Project Details

Company Name: Cool Air Solutions Pty Ltd ABN: 12 345 678 901 Project / Site Address: 123 Smith Street, Parramatta NSW Date of Preparation: 12 October 2023

High-Risk Construction Work Details

Activity: Installation of Split System Air Conditioning - Commercial Office Specific High-Risk Tasks: Work at heights (>2m on roof), Electrical connections, Use of hazardous chemicals (R410A)

Hazard Identification, Risk Assessment and Control Measures

Step / TaskHazard IdentificationPotential HarmRisk RatingControl MeasuresRisk Rating
Roof AccessFalling through skylight, falling off edge ladderDeathE1. Use mobile scaffold for access to edge. <br> 2. Cover skylights with mesh. <br> 3. Worker wears travel restraint harness clipped to anchor point. <br> 4. Second person holds ladder at base.L
Brazing PipesOxy-acetylene flashback, burns to handsBurnsH1. Check flashback arrestors are current. <br> 2. Wear flame-resistant gauntlets and safety glasses. <br> 3. Clear area of cardboard/insulation 2 meters around work zone. <br> 4. Have wet towel and fire extinguisher ready.M
Electrical ConnectAccidental start-up of powerElectrocutionE1. Lock out main switchboard with Master Tag. <br> 2. Test terminals with multimeter (Live/Dead/Live). <br> 3. Only licensed electrician terminates mains cables.L

Sign Off

Worker NameSignatureDate
John SmithJ. Smith12/10/23
Mick JonesM. Jones12/10/23

PCBU Representative: Name: S. Manager Signature: S. Manager Date: 12/10/23

Notes

This example demonstrates a simplified view of the SWMS focusing on the highest risk activities. It shows how the Risk Rating moves from Extreme (E) to Low (L) after applying the hierarchy of controls. Note the specific mention of 'Lock out Tag out' and 'Flashback arrestors' which are critical compliance points.

About this Example

Part of the SWMS - Refrigeration Mechanic document collection

Document Type

SWMS - Refrigeration Mechanic

This SWMS is required for refrigeration mechanics performing high-risk construction work, such as installing or splitting AC units on roofs, handling hydrocarbon refrigerants, or working near live electrical panels.

Complexity

complex

Risk Level

high