PropoDoc provides self-help document templates and tools. It is not a law firm and does not provide legal advice. Learn more.
Skip to main content
Example
form

SWMS - Roof Plumber Example

Example document for SWMS - Roof Plumber. Use this as a reference when creating your own.

Professional Review Required

This document involves significant legal, financial, or compliance considerations. You must have a qualified professional review and approve this document before use. Do not rely on this template as legal advice.

Document: SWMS - Roof Plumber

Example Document

Last updated 7/30/2026

SAFE WORK METHOD STATEMENT (SWMS)

1. COMPANY & PROJECT DETAILS

Company Name: Apex Plumbing Solutions Pty Ltd ABN: 12 345 678 901 Site Address: 42 Smith Street, Richmond VIC Project Title: New Roof Installation - Unit 4 Date Prepared: 12/10/2023

2. JOB DESCRIPTION

Task: Installation of Colorbond Roofing and Downpipes Specific Activities: Installing roof battens, laying metal sheets, screw fixing, installing fascia and gutter. Location of Work: Main roof, single storey dwelling. Approx height 4.5m. Date of Work: 15/10/2023 to 20/10/2023

3. HAZARD IDENTIFICATION & RISK ASSESSMENT (EXTRACT)

Step / TaskHazard(s)Risk BeforeControl MeasuresRisk After
Accessing RoofFall from ladderHigh1. Scaffold erected to eaves level. 2. Ladder used only for initial access if scaffold not ready. Ladder tied off.Low
Installing SheetsFalling from edgeHigh1. Scaffold with handrail used as edge protection. 2. Harness and travel restraint used if working within 1m of edge.Low
Cutting SheetsEye injuryMedium1. Use nibblers instead of grinder where possible. 2. Safety glasses worn at all times.Low

4. PPE REQUIREMENTS

All workers on site:

  • Helmet: Vented white helmet.
  • Boots: Lace up, non-slip, steel midsole.
  • Harness: Full body harness with adjustable lanyard (2m length).
  • Glasses: Clear safety glasses.
  • Gloves: Leather rigging gloves.

5. SIGN-OFF

Supervisor: John Smith

Workers:

  1. Mark Jones (Signed)
  2. David Lee (Signed)

Both workers confirmed they have completed Working at Heights training.

Notes

This example shows a filled-out SWMS for a specific domestic roofing job. It notes the use of scaffold as the primary control measure for edge protection. It highlights the specific PPE chosen for the job. It demonstrates the sign-off process where workers acknowledge they understand the risks and controls.

About this Example

Part of the SWMS - Roof Plumber document collection

Document Type

SWMS - Roof Plumber

This SWMS is required for roof plumbing work involving heights over 2 metres, roof installations, repairs, and maintenance where fall risks exist.

Complexity

complex

Risk Level

high