SWMS - Solar PV Installer Example

Example document for SWMS - Solar PV Installer. Use this as a reference when creating your own.

Professional Review Required

This document involves significant legal, financial, or compliance considerations. You must have a qualified professional review and approve this document before use. Do not rely on this template as legal advice.

Document: SWMS - Solar PV Installer

Example Document

Last updated 7/30/2026

SAFE WORK METHOD STATEMENT (SWMS)

Company/Business Name: Solar Solutions Pty Ltd ABN: 12 345 678 901 Date Prepared: 12/10/2023

1. JOB DETAILS

Project/Job Address: 42 Sunshine Blvd, Brendale QLD 4500 Client Name: John Smith Date of Work: 15/10/2023 to 16/10/2023 Principal Contractor/PCBU: Solar Solutions Pty Ltd Description of Work: Installation of 6.6kW Solar PV system including 18 x 370W panels, 5kW inverter, and roof mounting on tiled roof.

2. TASK BREAKDOWN & HAZARD IDENTIFICATION

High Risk Construction Activity (HRCA)Specific TasksHazardsRisksInitial Risk Rating (L/M/H)Control Measures (Hierarchy of Controls)Residual Risk Rating (L/M/H)
Working at HeightsWalking on tiled roof, drilling for bracketsSlipping on tiles, falling off edgeDeath, fracturesH1. Elimination: N/A.<br>2. Engineering: Roof ladder (crawling board) used across tiles. Temporary anchor point installed on opposite ridge. Static line set up.<br>3. Admin: Weather check conducted. No work if wet. SWMS briefed.<br>4. PPE: Full harness connected to static line at all times.M
Electrical WorkTerminating DC strings at isolatorDC Arc flash, shockBurns, deathH1. Elimination: Panels covered with opaque blankets during connection.<br>2. Engineering: Use insulated screwdrivers.<br>3. Admin: Connect strings one at a time. Keep face away from terminals.<br>4. PPE: Safety glasses, Category 1 gloves.L
Manual HandlingLifting 20kg panels up ladderBack strain, dropping panel on personInjury, cutsM1. Elimination: N/A.<br>2. Engineering: Use a roof hoist/pulley system.<br>3. Admin: Two person lift required. Guide at top, lifter at bottom.<br>4. PPE: Gloves.L

3. INSPECTION & CHECKLISTS

  • Fall Protection Equipment: Yes - Harnesses inspected by J. Bloggs 10/10/2023. Anchor points certified by EngCert.
  • Electrical Test Equipment: Yes - Multimeter calibrated and tagged.
  • Power Tools: Yes - Cordless drill checked and tagged.

4. PERSONAL PROTECTIVE EQUIPMENT (PPE)

  • Safety Helmet
  • Safety Glasses
  • High Visibility Shirt
  • Steel Cap Boots
  • Gloves
  • Harness

5. EMERGENCY PROCEDURES

Nearest Hospital: Prince Charles Hospital - 07 1234 5678 Emergency Services: 000 Site Assembly Point: Front driveway near letterbox

6. SIGN-OFF

NameSignatureDate
J. SmithJS12/10/2023
M. JonesMJ12/10/2023

Principal Contractor Acceptance:

NameSignatureDate
B. BrownBB12/10/2023

Notes

This example shows a simplified view for a residential job. The Hazard Identification table demonstrates the hierarchy of controls applied. Note the specific mention of a roof ladder and a hoist, which are common controls for residential solar. The sign-off includes the PCBU acceptance.

About this Example

Part of the SWMS - Solar PV Installer document collection

Document Type

SWMS - Solar PV Installer

Use this SWMS for all high-risk construction work involving the installation of solar photovoltaic systems on residential, commercial, and industrial roofs.

Complexity

complex

Risk Level

high