Construction Method Statement Template
Template for Construction Method Statement. Customize this template for your specific needs.
Professional Review Required
This document involves significant legal, financial, or compliance considerations. You must have a qualified professional review and approve this document before use. Do not rely on this template as legal advice.
Document: Construction Method Statement
Template Preview
Version 1 • Last updated 7/30/2026
Project Details
Project Name: [INSERT PROJECT NAME] Project Address: [INSERT SITE ADDRESS] Client Name: [INSERT CLIENT NAME] Date Prepared: [INSERT DATE] Prepared By: [INSERT YOUR NAME/COMPANY]
1. Project Description
Provide a brief overview of the works to be undertaken. Include the scope of work, contract value, and key dates.
[INSERT DESCRIPTION OF WORKS]
2. Site Information
Describe the site conditions. Include access points, egress routes, and location of amenities.
[INSERT SITE CONDITIONS AND LAYOUT]
3. Standards and Legislation
List the relevant Australian Standards and legislation applicable to this project.
- Work Health and Safety Act 2011
- Work Health and Safety Regulation 2011
- [INSERT OTHER RELEVANT STANDARDS E.G. AS/NZS 3000 FOR ELECTRICAL]
4. Project Team and Responsibilities
List key personnel and their safety roles.
- Project Manager: [NAME] - Responsible for overall safety compliance.
- Site Supervisor: [NAME] - Responsible for daily safety monitoring.
- First Aid Officer: [NAME] - Responsible for first aid treatment.
5. Sequence of Works
Outline the order of operations from start to finish.
- [INSERT STEP 1: E.G. SITE SETUP AND FENCING]
- [INSERT STEP 2: E.G. EXCAVATION]
- [INSERT STEP 3: E.G. CONCRETE POUR]
- [INSERT STEP 4: E.G. STRUCTURAL ERECTION]
- [INSERT STEP 5: E.G. COMMISSIONING AND HANDOVER]
6. Risk Management
Identify hazards and control measures for each stage of the work.
| Task / Activity | Hazard | Risk Level | Control Measures |
|---|---|---|---|
| [INSERT ACTIVITY] | [INSERT HAZARD] | High / Med / Low | [INSERT CONTROLS] |
| [INSERT ACTIVITY] | [INSERT HAZARD] | High / Med / Low | [INSERT CONTROLS] |
7. Plant and Equipment
List all machinery and equipment to be used on site.
- [INSERT EQUIPMENT] - [INSERT INSPECTION STATUS]
- [INSERT EQUIPMENT] - [INSERT INSPECTION STATUS]
8. Environmental Management
Detail how you will manage dust, noise, waste, and water runoff.
[INSERT ENVIRONMENTAL CONTROLS]
9. Emergency Procedures
Detail the response to fires, injuries, and other emergencies.
- Fire: [INSERT FIRE PROCEDURE]
- First Aid: [LOCATION OF FIRST AID KIT]
- Emergency Contact: 000
10. Sign Off
I acknowledge that I have read and understood this Construction Method Statement.
Workers Signature: ___________________ Date: __________
Principal Contractor Approval: ___________________ Date: __________
About this Template
Part of the Construction Method Statement document collection
Document Type
Construction Method Statement
A document outlining how a construction project will be carried out safely, efficiently and in compliance with Australian regulations.