Manual Handling Risk Assessment Template
Template for Manual Handling Risk Assessment. Customize this template for your specific needs.
Professional Review Required
This document involves significant legal, financial, or compliance considerations. You must have a qualified professional review and approve this document before use. Do not rely on this template as legal advice.
Document: Manual Handling Risk Assessment
Template Preview
Version 1 • Last updated 7/29/2026
Manual Handling Risk Assessment Form
Business Name: [Enter Business Name] Job/Task Location: [Enter Location] Date of Assessment: [DD/MM/YYYY] Assessor Name: [Enter Name] Position: [Enter Position]
1. Task Description
Task being assessed: [Briefly describe the task, e.g. Lifting boxes of tiles from delivery truck to site storeroom]
Workers involved: [List names or positions of workers doing this task]
2. Hazard Identification
Tick the boxes that apply to this task.
Posture and Movement
- Bending the back forwards or sideways more than 20 degrees
- Twisting the back or neck
- Working with hands above shoulder height
- Working with hands below knuckle height
- Squatting or kneeling
- Reaching away from the body
- Repetitive movements (more than 2 times per minute)
Force and Effort
- Lifting, lowering or carrying heavy loads (over 15kg)
- Pushing or pulling loads with high force
- Using a tool or grip that requires high force
- Sudden or jerky movements
Vibration
- Using vibrating tools or machinery
Environment
- Working in a confined space
- Working on uneven or slippery surfaces
- Working in extreme hot or cold temperatures
- Poor lighting
Other
- Handling people or animals
- Sitting or standing for long periods
3. Risk Assessment
Initial Risk Rating (Before Controls):
- Low: Unlikely to cause injury
- Medium: Could cause injury, but not severe
- High: Likely to cause severe or serious injury
Reasons for rating: [Explain why you gave this rating based on the hazards above]
4. Risk Controls
Select controls using the Hierarchy of Control. Choose as many as needed.
Elimination (Most Effective)
- Can the task be removed completely? [Yes/No/Details]
Substitution
- Can we use a lighter load? [Details]
- Can we use a smaller container? [Details]
- Can we use a mechanical aid instead? [Details]
Engineering Controls
- Modify workplace layout (e.g. raise workbench)
- Use trolleys, hoists, forklifts or ramps
- Use handles or holders to improve grip
- Reduce forces needed (e.g. friction reduction)
Administrative Controls
- Rotate workers to reduce exposure time
- Provide training in safe handling techniques
- Schedule maintenance to prevent faults
- Implement work rest breaks
Personal Protective Equipment (Least Effective)
- Gloves
- Safety boots
- Back support (only as supplement to other controls)
Specific Action Plan:
| Action Required | By Whom (Person Responsible) | Target Date | Status |
|---|---|---|---|
| [e.g. Purchase pallet jack] | [e.g. Site Manager] | [DD/MM/YYYY] | [ ] Done [ ] Pending |
| [e.g. Train staff on new lift] | [e.g. Supervisor] | [DD/MM/YYYY] | [ ] Done [ ] Pending |
| [e.g. Install shelving at waist height] | [e.g. Maintenance Team] | [DD/MM/YYYY] | [ ] Done [ ] Pending |
5. Residual Risk Assessment
Residual Risk Rating (After Controls):
- Low: Risk is acceptable
- Medium: Further action needed
- High: Task must not proceed until controls improve
6. Sign Off
Assessor Signature: __________________________ Date: __________________________
Worker Representative Signature: __________________________ Date: __________________________
Review Date: [DD/MM/YYYY]
About this Template
Part of the Manual Handling Risk Assessment document collection
Document Type
Manual Handling Risk Assessment
A document used to identify hazards and control risks associated with manual tasks in the workplace to prevent musculoskeletal disorders.