Method Statement (Non-Construction) Template
Template for Method Statement (Non-Construction). Customize this template for your specific needs.
Professional Review Recommended
This document may have legal or financial implications. We recommend having a qualified professional review the final version before use.
Document: Method Statement (Non-Construction)
Template Preview
Version 1 • Last updated 7/27/2026
Method Statement (Non-Construction)
Project / Task Details
Company Name: [COMPANY NAME] ABN: [ABN] Job Reference Number: [REF NUMBER] Date of Preparation: [DATE]
Task Description: [BRIEF DESCRIPTION OF THE WORK TO BE UNDERTAKEN]
Location of Work: [SITE ADDRESS OR SPECIFIC LOCATION WITHIN A FACILITY]
Date and Time of Work: [START DATE] to [END DATE] [WORK HOURS]
Personnel: Name: [SUPERVISOR NAME] | Role: [SUPERVISOR ROLE] Name: [WORKER 1 NAME] | Role: [WORKER ROLE] Name: [WORKER 2 NAME] | Role: [WORKER ROLE]
1. Hazards and Risks
| Hazard | Who is at Risk | Potential Consequence | Initial Risk Rating (L/M/H) |
|---|---|---|---|
| [HAZARD 1, e.g. Use of chemicals] | [WHO, e.g. Operator, nearby staff] | [CONSEQUENCE, e.g. Chemical burn, respiratory issue] | [RATING] |
| [HAZARD 2, e.g. Moving vehicles] | [WHO] | [CONSEQUENCE] | [RATING] |
| [HAZARD 3] | [WHO] | [CONSEQUENCE] | [RATING] |
2. Control Measures
[Describe the measures taken to control the risks listed above. Refer to the Hierarchy of Controls.]
Hazard 1: [NAME]
- Elimination: [Can it be removed?]
- Substitution: [Can something safer be used?]
- Engineering: [Guards, barriers, ventilation]
- Administrative: [Training, signage, permits]
- PPE: [Gloves, respirator, goggles]
Hazard 2: [NAME]
- [List controls as above]
3. Step by Step Method / Sequence of Work
Step 1: Preparation
- Action: [Describe setup, e.g., Barricading the work area]
- Risk: [Associated risk]
- Controls: [Safety measure]
Step 2: [Activity Name]
- Action: [Describe the specific action]
- Risk: [Associated risk]
- Controls: [Safety measure]
Step 3: [Activity Name]
- Action: [Describe the specific action]
- Risk: [Associated risk]
- Controls: [Safety measure]
Step 4: Cleanup and Demobilisation
- Action: [Describe cleanup, e.g., Removing waste, removing signs]
- Risk: [Associated risk]
- Controls: [Safety measure]
4. Plant and Equipment
| Item | Inspection Date | Next Due Date | Operator License/Competency |
|---|---|---|---|
| [EQUIPMENT 1] | [DATE] | [DATE] | [LICENSE NUMBER OR 'COMPETENT'] |
| [EQUIPMENT 2] | [DATE] | [DATE] | [LICENSE NUMBER OR 'COMPETENT'] |
5. Personal Protective Equipment (PPE)
[ ] High Visibility Vest/Shirt [ ] Safety Helmet [ ] Safety Glasses/Goggles [ ] Safety Boots (Steel cap/composite) [ ] Gloves (Specify type: [TYPE]) [ ] Hearing Protection [ ] Respiratory Protection (Specify type: [TYPE]) [ ] Dust Mask [ ] Other: [SPECIFY]
6. Emergency Procedures
Nearest First Aid Kit Location: [LOCATION] Emergency Assembly Point: [LOCATION] Fire Extinguisher Location: [LOCATION]
Emergency Contacts:
- Site Supervisor: [NAME] - [PHONE NUMBER]
- Emergency Services: 000
- Poisons Information Centre: 13 11 26
- Local Hospital: [NAME] - [PHONE NUMBER]
7. Sign Off
I acknowledge I have read and understood the contents of this Method Statement. I agree to follow all safety controls and procedures listed.
Worker 1: ____________________ Date: ______ Worker 2: ____________________ Date: ______ Worker 3: ____________________ Date: ______
Supervisor / Manager: ____________________ Date: ______
About this Template
Part of the Method Statement (Non-Construction) document collection
Document Type
Method Statement (Non-Construction)
A method statement outlines the step by step process for completing a specific task safely and efficiently. It helps businesses manage risk and comply with Australian Work Health and Safety laws.