Spotter Checklist (Overhead Powerlines) Template
Template for Spotter Checklist (Overhead Powerlines). Customize this template for your specific needs.
Professional Review Required
This document involves significant legal, financial, or compliance considerations. You must have a qualified professional review and approve this document before use. Do not rely on this template as legal advice.
Document: Spotter Checklist (Overhead Powerlines)
Template Preview
Version 1 • Last updated 7/29/2026
Spotter Checklist for Overhead Powerlines
Job Details:
- Company Name: [Company Name]
- Site Address: [Site Address]
- Date: [DD/MM/YYYY]
- Job Number: [Job Number]
- Supervisor Name: [Supervisor Name]
Plant / Machinery Details:
- Type of Plant: [e.g., Mobile Crane, Tip Truck, EWP]
- Make/Model: [Make/Model]
- Plant ID/Reg: [Registration Number]
- Maximum Height/Reach: [Metres]
Powerline Details:
- Location of Lines: [e.g., Northern boundary, above driveway]
- Line Voltage: [e.g., Low Voltage (240/415V), 11kV, 66kV, Unknown (Treat as最高)]
- Required Exclusion Zone: [Metres - refer to AS/NZS 4836 or Network Provider]
- Height of Lines above ground: [Metres]
- Are Tiger Tails installed? [Yes / No / N/A]
Spotter Details:
- Spotter Name: [Full Name]
- Spotter Qualification: [e.g., Safety Observer Course, Statement of Attainment]
- Qualification Number: [Certificate Number]
- Is the Spotter not the Operator? [Yes / No]
Pre-Work Checklist:
- Site induction completed with all workers.
- Underground assets located (Before You Dig plans checked).
- Overhead powerlines identified and marked on site plan.
- Exclusion zones measured and physically marked with cones or bunting if possible.
- Emergency procedures discussed (What to do if contact occurs).
- Communication method agreed (Hand signals, UHF radio, verbal).
- Weather conditions checked (Work to stop if lightning or high winds).
- Machinery stabilisers or outriggers deployed in safe zone.
Communication Plan:
- Stop Signal: [Describe the agreed stop signal]
- Emergency Signal: [Describe the agreed emergency signal]
- Radio Channel: [Channel Number if applicable]
Safe Work Method Statement (SWMS) Reference:
- SWMS Number: [Number]
- Specific Controls in place: [List specific controls from SWMS]
Declaration:
I, the undersigned, confirm that I have read and understood the contents of this checklist. I understand the location of the overhead powerlines and the required exclusion zones. I agree to follow the communication plan and emergency procedures.
Operator Signature: ______________________ Date: //____
I, the undersigned, confirm that I am a competent safety observer. I understand my duties are to observe the work and warn the operator of any risk of encroachment into the exclusion zone. I will remain focused on the task at all times and will not perform any other duties while spotting.
Spotter Signature: ______________________ Date: //____
Supervisor Signature: ______________________ Date: //____
Network Provider Approval (if applicable):
- Reference Number: [Approval Ref #]
- Conditions: [List any specific conditions set by the provider]
About this Template
Part of the Spotter Checklist (Overhead Powerlines) document collection
Document Type
Spotter Checklist (Overhead Powerlines)
A safety checklist used when working near overhead powerlines to ensure spotters are in place and safety protocols are followed to prevent electrocution.