SWMS - Air Conditioning Installer (Split System) Template
Template for SWMS - Air Conditioning Installer (Split System). Customize this template for your specific needs.
Professional Review Required
This document involves significant legal, financial, or compliance considerations. You must have a qualified professional review and approve this document before use. Do not rely on this template as legal advice.
Document: SWMS - Air Conditioning Installer (Split System)
Template Preview
Version 1 • Last updated 7/30/2026
COMPANY DETAILS
Company Name: [ENTER COMPANY NAME] ABN: [ENTER ABN] Address: [ENTER ADDRESS]
JOB DETAILS
Job Title / Address: [ENTER SITE ADDRESS] Date of Work: [ENTER START DATE] to [ENTER END DATE] Supervisor Name: [ENTER NAME] Mobile: [ENTER NUMBER]
TASK DESCRIPTION
Scope of Works: [DESCRIBE THE JOB, e.g., Install back-to-back split system air conditioner. Mount indoor unit on wall, drill hole through brick, mount outdoor unit on concrete slab at ground level, run refrigerant pipes and electrics.]
HAZARDS AND RISKS
| High Risk Construction Activity | Hazard/s | Risk | H | M | L | Initial Risk Rating | Control Measures | H | M | L | Residual Risk Rating |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Working at Heights (Mounting indoor unit or outdoor unit brackets) | Fall from ladder, collapse of ladder, over-reaching. | Serious injury or death. | X | [SELECT] | 1. Use platform ladder or scaffold if height > 2m. <br> 2. Set ladder on firm level ground. <br> 3. Maintain 3 points of contact. <br> 4. Use a second person to foot the ladder. <br> 5. Do not over-reach. | X | [SELECT] | ||||
| Electrical Work (Connecting power to indoor unit and outdoor isolator) | Electric shock, electrocution, arc flash. | Death or serious burns. | X | [SELECT] | 1. Isolate power at switchboard and test for dead before starting. <br> 2. Lock out / Tag out (LOTO) the switch. <br> 3. Use only licensed electrician for hard wiring. <br> 4. Use insulated tools. <br> 5. Use Residual Current Device (RCD) on power tools. | X | [SELECT] | ||||
| Manual Handling (Lifting indoor unit or outdoor compressor) | Musculoskeletal injury, back strain, crush injury. | Chronic pain or injury. | X | [SELECT] | 1. Assess weight of unit (typically > 25kg for outdoor). <br> 2. Use a mechanical trolley or hoist for outdoor unit. <br> 3. Use correct lifting techniques (bend knees, keep back straight). <br> 4. Seek assistance from a second person. | X | [SELECT] | ||||
| Use of Power Tools (Drilling through walls for pipework) | Noise induced hearing loss, eye injury, cuts. | Permanent disability. | X | [SELECT] | 1. Wear hearing protection. <br> 2. Wear safety glasses. <br> 3. Use dust extraction or mask. <br> 4. Inspect cords for damage before use. | X | [SELECT] | ||||
| Refrigerant Handling (Flaring pipes and vacuuming) | Exposure to refrigerant gas, chemical burns, frostbite. | Skin damage or respiratory irritation. | X | [SELECT] | 1. Wear safety glasses and gloves. <br> 2. Ensure correct ventilation. <br> 3. Check for leaks with bubble solution. <br> 4. Use correct manifold gauges. | X | [SELECT] |
RISK RATING MATRIX
(Insert Company Matrix here - usually Consequence vs Likelihood)
HIERARCHY OF CONTROLS
This SWMS applies the following controls:
- Elimination: Can the work be done on the ground? No.
- Substitution: Use lighter units? No.
- Engineering: Use mechanical lifting aids, scissor lifts, or scaffold.
- Administrative: SWMS induction, permits, warning signs.
- PPE: Safety helmet, glasses, gloves, boots, hearing protection.
PERSONAL PROTECTIVE EQUIPMENT (PPE)
All workers engaged in this task must wear:
- High Visibility shirt/vest
- Long trousers (no shorts)
- Steel capped safety boots
- Safety glasses / goggles
- Cut resistant gloves (for sheet metal work)
- Safety Helmet (when working outdoors or where falling objects exist)
- Hearing Protection (when drilling)
- Sunscreen (if outdoors)
SAFE WORK METHOD / STEPS
Step 1: Pre-Start and Site Set Up
- Review SWMS with all workers.
- Inspect site for hazards (powerlines, asbestos, fragile surfaces).
- Erect signs and barriers.
- Set up equipment safely.
Step 2: Mounting Indoor Unit
- Mark wall stud locations using stud finder.
- Drill mounting holes.
- Install mounting bracket securely to wall studs.
- Lift unit onto bracket with assistance if required.
Step 3: Drilling Interconnecting Pipe Hole
- Check for concealed services on the other side of the wall.
- Use appropriate PPE (dust mask, glasses).
- Drill hole at downward angle for drainage.
Step 4: Mounting Outdoor Unit
- Ensure location allows for adequate airflow and service access.
- If mounting on brackets, ensure brackets are fixed to solid structure.
- Use mechanical aid or two people to lift unit.
Step 5: Electrical Connection
- ISOLATE MAIN POWER.
- Apply Lock Out Tag Out.
- Test for dead.
- Run cabling and connect as per wiring diagram.
- Licensed Electrician to perform final hard connection.
Step 6: Refrigerant Piping and Testing
- Flare pipes correctly using flaring tool.
- Connect pipes to indoor and outdoor units.
- Pressure test lines with nitrogen.
- Vacuum lines to remove moisture.
- Charge with refrigerant.
Step 7: Commissioning and Clean Up
- Switch on power.
- Test operation (Cooling/Heating).
- Check for leaks and temperature differential.
- Remove all packaging and debris.
EMERGENCY PROCEDURES
Nearest Hospital: [ENTER NAME AND ADDRESS] Emergency Contact: 000 Fire Extinguisher Location: [ENTER LOCATION] First Aid Kit Location: [ENTER LOCATION]
Incident Response:
- Ensure area is safe.
- Administer First Aid if qualified.
- Call 000 if serious.
- Secure the site.
- Notify Supervisor/PCBU immediately.
SIGN OFF
I have read and understood the contents of this SWMS. I agree to follow all safety controls and wear the specified PPE.
| Worker Name | Signature | Date |
|---|---|---|
| [PRINT NAME] | [SIGN] | [DATE] |
| [PRINT NAME] | [SIGN] | [DATE] |
| [PRINT NAME] | [SIGN] | [DATE] |
Principal Contractor / PCBU Representative:
Name: ______________________ Signature: ______________________ Date: ___________
About this Template
Part of the SWMS - Air Conditioning Installer (Split System) document collection
Document Type
SWMS - Air Conditioning Installer (Split System)
This SWMS is required for installers mounting split system air conditioning units. It covers high-risk construction work including working at heights, electrical work, and manual handling.