SWMS - Bricklayer / Blocklayer Template

Template for SWMS - Bricklayer / Blocklayer. Customize this template for your specific needs.

Professional Review Required

This document involves significant legal, financial, or compliance considerations. You must have a qualified professional review and approve this document before use. Do not rely on this template as legal advice.

Document: SWMS - Bricklayer / Blocklayer

Template Preview

Version 1 • Last updated 7/30/2026

SAFE WORK METHOD STATEMENT (SWMS)

Company Details

Company Name: [COMPANY NAME] ABN: [ABN] Address: [ADDRESS]

Project / Job Details

Site Address: [SITE ADDRESS] Job Title / Description: [JOB DESCRIPTION] Date of Work: [DATE] SWMS Number: [SWMS NUMBER]

High Risk Construction Work (HRCW)

This SWMS applies to the following HRCW activities (check all that apply):

  • Work involving a risk of a fall over 2 metres
  • Work carried out on or near energised electrical installations
  • Work involving the use of powered mobile plant
  • Work involving structural alterations or repairs that require temporary support
  • Work in or near a confined space
  • Work in or near a shaft or trench deeper than 1.5 metres
  • Work involving the use of explosives
  • Work on or near pressurised gas distribution mains or piping
  • Work on or near chemical, fuel or refrigerant lines
  • Work near traffic
  • Work near moving plant
  • Work on or near water
  • Work that involves demolition
  • Work that involves asbestos

Sign-Off (Preparation)

I confirm this SWMS accurately identifies the risks and control measures for the work described.

Principal Contractor / PCBU Representative: ______________________ Date: //____ Signature: ______________________

1. Job Steps / Tasks

List each step of the bricklaying or blocklaying task in sequence.

StepDescription of Task
1[e.g. Site set up and exclusion zones]
2[e.g. Delivery and loading of bricks/blocks]
3[e.g. Mixing mortar]
4[e.g. Erecting scaffold / working platform]
5[e.g. Laying bricks / blocks]
6[e.g. Cutting masonry]
7[e.g. Installation of lintels and ties]
8[e.g. Cleaning up and dismantling scaffold]

2. Hazards, Risks and Control Measures

Job StepHazard(s)Potential HarmRisk Rating (Before Controls)Control Measures (Hierarchy of Controls)Risk Rating (After Controls)
[Insert Step 1][e.g. Slips, trips, falls][e.g. Fractures, bruising][M/H/L]Elimination/Minimisation: <br>1. Keep work area clean and free of debris.<br>2. Ensure adequate lighting.<br>Admin: <br>3. Inspect site daily.<br>PPE: <br>4. Steel capped boots.[M/H/L]
[Insert Step 2][e.g. Heavy lifting, manual handling][e.g. Back injury, MSD][M/H/L]Substitution: <br>1. Use a brick cart or conveyor.<br>Engineering: <br>2. Store materials at waist height.<br>Admin: <br>3. Rotate tasks to avoid fatigue.<br>PPE: <br>4. Safety gloves.[M/H/L]
[Insert Step 3][e.g. Cement dust, silica][e.g. Silicosis, skin irritation][M/H/L]Engineering: <br>1. Keep mixer lid closed.<br>2. Use dust extraction if dry mixing.<br>Admin: <br>3. Work upwind.<br>PPE: <br>4. P2 Respirator, safety glasses, long sleeves.[M/H/L]
[Insert Step 4][e.g. Fall from height][e.g. Serious injury, death][H]Substitution: <br>1. Use scaffold instead of ladders.<br>Engineering: <br>2. Ensure scaffold is tagged and compliant (AS 1576).<br>3. Install toe boards and handrails.<br>Admin: <br>4. Only licensed scaffolders to erect scaffold.<br>PPE: <br>5. Safety use if required.[L]
[Insert Step 5][e.g. Falling objects][e.g. Head injury][H]Engineering: <br>1. Use toe boards on scaffold.<br>2. Use debris nets.<br>Admin: <br>3. Establish exclusion zone below work area.<br>4. Do not throw tools or materials.<br>PPE: <br>5. Hard hat.[L]
[Insert Step 6][e.g. Noise, dust from cutting][e.g. Hearing loss, lung disease][H]Engineering: <br>1. Use wet cutting saw.<br>2. Attach vacuum to power tools.<br>Admin: <br>3. Isolate cutting area.<br>PPE: <br>4. Class 5 earmuffs, P2 respirator, eye protection.[L]
[Insert Step 7][e.g. Working near power lines][e.g. Electrocution][H]Elimination: <br>1. De-energise if possible.<br>Engineering: <br>2. Use non-conductive ladders.<br>Admin: <br>3. Check 'Dial Before You Dig' plans.<br>4. Maintain safe clearance distances.<br>PPE: <br>5. Rubber gloves.[L]
[Insert Step 8][e.g. Working with powered mobile plant][e.g. Crush injury][H]Engineering: <br>1. Use traffic control barriers.<br>2. Fit reversing alarms and signals.<br>Admin: <br>3. Use spotters / doggers.<br>4. No pedestrian access in loading zones.<br>PPE: <br>5. High visibility vest.[L]

3. Personal Protective Equipment (PPE)

Specify the PPE required for all tasks.

  • Safety Helmet (AS/NZS 1801)
  • High Visibility Clothing (AS/NZS 4602)
  • Safety Boots (AS/NZS 2210)
  • Safety Glasses / Goggles (AS/NZS 1337)
  • Hearing Protection (Class 5)
  • Dust Mask (P2)
  • Sun Protection (Hat, Sunscreen 30+)
  • Gloves (Cut resistant or general purpose)
  • Safety Use (if working at heights > 2m without scaffold)
  • Wet Weather Gear

4. Emergency Procedures

Emergency Services: 000 Nearest Hospital: [HOSPITAL NAME AND ADDRESS] Emergency Assembly Point: [LOCATION]

First Aid:

  • First Aid Kit located at [LOCATION]
  • Trained First Aider: [NAME]

Incident Reporting:

  • All incidents, including near misses, must be reported to the Supervisor immediately.
  • Serious incidents must be reported to SafeWork NSW immediately.

Fire Safety:

  • Fire Extinguishers located at: [LOCATIONS]
  • Fire Hose Reel located at: [LOCATION]

5. Training and Competency

Workers carrying out these tasks must have the following training and licenses:

  • General Construction Induction Card (White Card)
  • Site Specific Induction
  • High Risk Work License (Scaffolding Basic/Intermediate) - [NAME]
  • High Risk Work License (Forklift) - [NAME]
  • Manual Handling Training
  • Working at Heights Training

6. Review and Monitoring

This SWMS must be reviewed:

  • If a hazard is identified that is not covered.
  • If an incident occurs.
  • If control measures are not effective.
  • Before any changes to the work method.
  • At regular intervals (at least every 2 years).

Last Review Date: [DATE] Next Review Date: [DATE]

7. Worker Sign-Off

I have read and understood the content of this SWMS. I agree to follow the control measures listed.

Worker NameSignatureDate
[WORKER 1]
[WORKER 2]
[WORKER 3]
[WORKER 4]
[WORKER 5]
Use in GeneratorView Guide

About this Template

Part of the SWMS - Bricklayer / Blocklayer document collection

Document Type

SWMS - Bricklayer / Blocklayer

This SWMS is required for all bricklaying and blocklaying work on Australian construction sites that involves high-risk construction work, such as working at heights over 2 metres or using powered mobile plant.

Complexity

complex

Format

form