SWMS - Ceiling Fixer Template
Template for SWMS - Ceiling Fixer. Customize this template for your specific needs.
Professional Review Required
This document involves significant legal, financial, or compliance considerations. You must have a qualified professional review and approve this document before use. Do not rely on this template as legal advice.
Document: SWMS - Ceiling Fixer
Template Preview
Version 1 • Last updated 7/30/2026
SAFE WORK METHOD STATEMENT (SWMS)
Company / Project Details
Company Name: [COMPANY NAME] ABN: [ABN] Site Address: [SITE ADDRESS] Date of Preparation: [DATE]
Job / Task Description
Task Title: Ceiling Fixer Installation Work Location of Work: [SPECIFIC LOCATION ON SITE] Date of Work: [START DATE] to [END DATE]
**Description of Work: [Insert detailed description of the ceiling work, e.g., Installation of 600x600 suspended grid ceiling in Level 2 offices. Includes cutting plasterboard, lifting materials, and fixing ceiling tiles.]
Persons Responsible
Principal Contractor / PCBU: [NAME] Supervisor: [NAME] Mobile: [PHONE NUMBER]
Step 1: Hazards and Risks
| Task / Step | Hazard | Risk | Potential Harm | H | M | L |
|---|---|---|---|---|---|---|
| Example: Lifting plasterboard sheets | Manual handling | Strain / Sprain | Back injury | X | ||
| Example: Working from ladder | Falls from height | Fall | Fractures / Death | X | ||
| Example: Cutting plasterboard | Silica dust | Respiratory disease | Silicosis | X | ||
| Example: Using power drill | Noise | Hearing loss | Permanent damage | X | ||
| [TASK STEP] | [HAZARD] | [RISK] | [HARM] | [X] | [X] | [X] |
Risk Rating Key:
- H (High): Immediate action required. Stop work.
- M (Medium): Action required soon.
- L (Low): Monitor and maintain controls.
Step 2: Control Measures
| Task / Step | Control Measures (Hierarchy of Controls) | Who | When |
|---|---|---|---|
| Manual Handling | 1. Assess load weight. 2. Use mechanical aids (e.g., plasterboard lift). 3. Use team lifting techniques. 4. Store materials at waist height. | Worker | Ongoing |
| Work at Heights | 1. Eliminate work at height if possible. 2. Use scaffolding > ladders. 3. Ensure scaffolding tagged by competent person. 4. Use edge protection on open floors. 5. Wear use if required. | Worker | Ongoing |
| Dust and Silica | 1. Use low-dust cutting tools. 2. Keep area wet. 3. Use on-tool dust extraction. 4. Wear P2 respirator. 5. Keep area well ventilated. | Worker | Ongoing |
| Power Tools | 1. Use residual current devices (RCDs). 2. Inspect cords for damage. 3. Remove guards only when safe. 4. Wear hearing protection and eye protection. | Worker | Ongoing |
| [TASK STEP] | [List specific controls starting with Elimination, then Substitution, Isolation, Engineering, Admin, PPE] | [WHO] | [WHEN] |
Step 3: Personal Protective Equipment (PPE)
Check the PPE required for this job:
- Safety Helmet (Class 1 or 2)
- High Visibility Clothing
- Safety Boots (Steel Cap)
- Safety Glasses / Goggles
- Cut Resistant Gloves
- Hearing Protection (Ear muffs or plugs)
- Dust Mask (P2 or higher)
- Safety Use (if working at heights)
- Sun Protection (Hat and sunscreen)
Step 4: Emergency Procedures
Emergency Contact: 000 First Aid Officer: [NAME] - [PHONE] Nearest Hospital: [HOSPITAL NAME] Assembly Point: [LOCATION]
Fire: Raise alarm. Evacuate via nearest exit. Do not use lifts. Injury: Apply first aid. Call 000 if serious. Do not move patient unless necessary. Electrical Shock: Do not touch person. Switch off power. Call 000.
Step 5: Worker Sign-off
I have read and understood the contents of this SWMS. I agree to follow all control measures listed. I understand that if I do not follow these controls, I may be breaching the WHS Act.
| Name | Signature | Date |
|---|---|---|
| [WORKER NAME] | [SIGN] | [DATE] |
| [WORKER NAME] | [SIGN] | [DATE] |
| [WORKER NAME] | [SIGN] | [DATE] |
| [WORKER NAME] | [SIGN] | [DATE] |
Step 6: Review
This SWMS will be reviewed:
- If an incident occurs.
- If there is a change in work conditions.
- If a new hazard is identified.
- Every 2 years or if regulations change.
Reviewed by: [NAME] Date: [DATE]
About this Template
Part of the SWMS - Ceiling Fixer document collection
Document Type
SWMS - Ceiling Fixer
This SWMS is required for any high-risk construction work involving fixing ceilings. It applies when working at heights over two metres, using powered mobile plant, or installing suspended ceiling systems.