PropoDoc provides self-help document templates and tools. It is not a law firm and does not provide legal advice. Learn more.
Skip to main content
Template
Free

SWMS - Ceiling Fixer Template

Template for SWMS - Ceiling Fixer. Customize this template for your specific needs.

Professional Review Required

This document involves significant legal, financial, or compliance considerations. You must have a qualified professional review and approve this document before use. Do not rely on this template as legal advice.

Document: SWMS - Ceiling Fixer

Template Preview

Version 1 • Last updated 7/30/2026

SAFE WORK METHOD STATEMENT (SWMS)

Company / Project Details

Company Name: [COMPANY NAME] ABN: [ABN] Site Address: [SITE ADDRESS] Date of Preparation: [DATE]

Job / Task Description

Task Title: Ceiling Fixer Installation Work Location of Work: [SPECIFIC LOCATION ON SITE] Date of Work: [START DATE] to [END DATE]

**Description of Work: [Insert detailed description of the ceiling work, e.g., Installation of 600x600 suspended grid ceiling in Level 2 offices. Includes cutting plasterboard, lifting materials, and fixing ceiling tiles.]

Persons Responsible

Principal Contractor / PCBU: [NAME] Supervisor: [NAME] Mobile: [PHONE NUMBER]

Step 1: Hazards and Risks

Task / StepHazardRiskPotential HarmHML
Example: Lifting plasterboard sheetsManual handlingStrain / SprainBack injuryX
Example: Working from ladderFalls from heightFallFractures / DeathX
Example: Cutting plasterboardSilica dustRespiratory diseaseSilicosisX
Example: Using power drillNoiseHearing lossPermanent damageX
[TASK STEP][HAZARD][RISK][HARM][X][X][X]

Risk Rating Key:

  • H (High): Immediate action required. Stop work.
  • M (Medium): Action required soon.
  • L (Low): Monitor and maintain controls.

Step 2: Control Measures

Task / StepControl Measures (Hierarchy of Controls)WhoWhen
Manual Handling1. Assess load weight. 2. Use mechanical aids (e.g., plasterboard lift). 3. Use team lifting techniques. 4. Store materials at waist height.WorkerOngoing
Work at Heights1. Eliminate work at height if possible. 2. Use scaffolding > ladders. 3. Ensure scaffolding tagged by competent person. 4. Use edge protection on open floors. 5. Wear use if required.WorkerOngoing
Dust and Silica1. Use low-dust cutting tools. 2. Keep area wet. 3. Use on-tool dust extraction. 4. Wear P2 respirator. 5. Keep area well ventilated.WorkerOngoing
Power Tools1. Use residual current devices (RCDs). 2. Inspect cords for damage. 3. Remove guards only when safe. 4. Wear hearing protection and eye protection.WorkerOngoing
[TASK STEP][List specific controls starting with Elimination, then Substitution, Isolation, Engineering, Admin, PPE][WHO][WHEN]

Step 3: Personal Protective Equipment (PPE)

Check the PPE required for this job:

  • Safety Helmet (Class 1 or 2)
  • High Visibility Clothing
  • Safety Boots (Steel Cap)
  • Safety Glasses / Goggles
  • Cut Resistant Gloves
  • Hearing Protection (Ear muffs or plugs)
  • Dust Mask (P2 or higher)
  • Safety Use (if working at heights)
  • Sun Protection (Hat and sunscreen)

Step 4: Emergency Procedures

Emergency Contact: 000 First Aid Officer: [NAME] - [PHONE] Nearest Hospital: [HOSPITAL NAME] Assembly Point: [LOCATION]

Fire: Raise alarm. Evacuate via nearest exit. Do not use lifts. Injury: Apply first aid. Call 000 if serious. Do not move patient unless necessary. Electrical Shock: Do not touch person. Switch off power. Call 000.

Step 5: Worker Sign-off

I have read and understood the contents of this SWMS. I agree to follow all control measures listed. I understand that if I do not follow these controls, I may be breaching the WHS Act.

NameSignatureDate
[WORKER NAME][SIGN][DATE]
[WORKER NAME][SIGN][DATE]
[WORKER NAME][SIGN][DATE]
[WORKER NAME][SIGN][DATE]

Step 6: Review

This SWMS will be reviewed:

  • If an incident occurs.
  • If there is a change in work conditions.
  • If a new hazard is identified.
  • Every 2 years or if regulations change.

Reviewed by: [NAME] Date: [DATE]

Use in GeneratorView Guide

About this Template

Part of the SWMS - Ceiling Fixer document collection

Document Type

SWMS - Ceiling Fixer

This SWMS is required for any high-risk construction work involving fixing ceilings. It applies when working at heights over two metres, using powered mobile plant, or installing suspended ceiling systems.

Complexity

complex

Format

form