SAFE WORK METHOD STATEMENT (SWMS)
Company Name: [INSERT COMPANY NAME] ABN: [INSERT ABN] Address: [INSERT ADDRESS]
Project/Job Address: [INSERT SITE ADDRESS] Date of Preparation: [DD/MM/YYYY]
1. JOB DETAILS
Activity: Ceiling Insulation Installation
Description of Work: [Insert description, e.g., Installation of fiberglass batts in residential roof space, removing old insulation, accessing roof via manhole and ladder.]
Site Specifics:
- Type of building: [e.g., Single storey, Double storey]
- Access points: [e.g., Ceiling manhole, Skylight]
- Roof pitch: [e.g., Low pitch, Steep pitch]
2. PERSONS RESPONSIBLE
Principal Contractor/PCBU Representative: [NAME] Supervisor: [NAME] Mobile Number: [PHONE NUMBER]
3. HAZARD IDENTIFICATION AND RISK ASSESSMENT
| Step / Task | Hazard | Potential Harm | Risk Before Controls (H/M/L) | Risk After Controls (H/M/L) | Control Measures (Hierarchy of Controls) |
|---|---|---|---|---|---|
| 1. Pre-start Inspection & Setup | Contact with overhead electrical lines during access setup | Electrocution, Death | H | M | - Locate all overhead powerlines before work starts.<br>- Maintain minimum approach distances.<br>- Use spotter for mobile plant. |
| 2. Accessing Roof Space (Manhole) | Falling from ladder | Musculoskeletal injury, Fractures | M | L | - Use industrial grade ladder in good condition.<br>- Tie off ladder at top and secure base.<br>- Maintain 3 points of contact.<br>- Do not carry loads up ladder. Use pulley or lift. |
| 3. Working in Roof Cavity | Exposure to electrical cables and ceiling joists | Electric shock, Burns, Death | H | L | - Turn off main power at switchboard where possible.<br>- If power cannot be isolated, use non-contact voltage tester before touching cables.<br>- Treat all cables as live.<br>- Do not step on ceiling joists; use crawl boards. |
| 4. Working in Roof Cavity | Heat Stress / Dehydration | Collapse, Heat stroke | M | L | - Schedule work for coolest part of day.<br>- Ensure adequate hydration (water provided).<br>- Take regular breaks in cool area.<br>- Monitor workers for signs of heat stress. |
| 5. Handling Insulation Materials | Skin irritation, Eye irritation, Respiratory issues from fibres | Dermatitis, Asthma | M | L | - Wear long disposable coveralls.<br>- Wear P2 respirator mask.<br>- Wear safety goggles and gloves.<br>- Wash hands and face before eating/drinking. |
| 6. Using Insulation Knife | Lacerations to hands | Cuts, Infection | M | L | - Use safety knives with retractable blades.<br>- Cut away from body.<br>- Wear cut-resistant gloves. |
| 7. Working Near Skylights / Holes | Falling through roof void | Death, Serious injury | H | L | - Install temporary guardrails or covers over skylights.<br>- Do not walk on fragile roofing materials.<br>- Use fall arrest use if working near edge. |
| 8. Manual Handling | Repetitive lifting, Awkward postures | Back injury | M | L | - Store insulation close to access point to minimize carrying.<br>- Use correct lifting techniques (bend knees, keep load close).<br>- Rotate tasks to avoid fatigue. |
4. SAFE WORK PROCEDURES
Pre-Work:
- Conduct site toolbox talk using this SWMS.
- Check weather conditions (do not work in roof space during extreme heat or storms).
- Inspect PPE for damage.
- Test electrical non-contact voltage tester.
- Isolate mains power if agreed with client.
During Work:
- Set up ladder safely on firm, level ground.
- Access roof space and scan for hazards immediately.
- Slide insulation packs into ceiling space rather than carrying them if possible.
- Lay out crawl boards over ceiling joists to create a safe walking path.
- Scan for electrical cables before cutting or placing insulation.
- Fit insulation snugly between joists without compressing material excessively.
- Keep work area clean of loose insulation offcuts to prevent tripping.
Post-Work:
- Remove all waste materials from site.
- Clean tools and PPE.
- Wash hands and face thoroughly.
- Restore power at switchboard if isolated.
- Secure manhole.
5. PERSONAL PROTECTIVE EQUIPMENT (PPE)
Mandatory PPE for all workers:
- Safety Helmet (Hard Hat)
- Safety Boots (Steel cap)
- High Visibility Clothing
- Long sleeve disposable coveralls
- P2 Respirator Mask (Minimum)
- Safety Glasses / Goggles
- Gloves (Cut resistant or suitable for insulation handling)
6. EMERGENCY PROCEDURES
Emergency Contacts:
- Emergency Services: 000
- Supervisor: [NAME] - [PHONE]
- Nearest Hospital: [INSERT HOSPITAL NAME]
First Aid:
- Location of First Aid Kit: [INSERT LOCATION, e.g., Site Office]
- Location of Eyewash Station: [INSERT LOCATION]
Incident Response:
- Ensure area is safe to enter.
- Administer first aid if trained.
- Call 000 if serious injury or illness.
- Notify Supervisor immediately.
- Preserve the incident site (if safe to do so) for investigation.
Confined Space Rescue:
- Due to restricted access in roof cavities, ensure a second person is always outside the manhole to assist in an emergency.
- Do not enter the roof space to rescue a collapsed worker without proper assessment of atmospheric hazards (e.g., gas). Call emergency services.
7. WORKER SIGN-OFF
I have read and understood the content of this SWMS. I agree to follow all safe work procedures and use the provided control measures and PPE.
| Worker Name | Worker Signature | Date |
|---|---|---|
| [WORKER 1 NAME] | [SIGNATURE] | [DATE] |
| [WORKER 2 NAME] | [SIGNATURE] | [DATE] |
| [WORKER 3 NAME] | [SIGNATURE] | [DATE] |
8. REVIEW DATE
This SWMS must be reviewed:
- If there is a change to the work activity.
- If there is an incident or near miss.
- If new hazards are identified.
- Every 2 years or sooner as required.
Next Review Date: [INSERT DATE]
About this Template
Part of the SWMS - Ceiling Insulation Installer document collection
Document Type
SWMS - Ceiling Insulation Installer
This SWMS is required for anyone installing insulation in roof spaces and ceilings. It addresses high-risk construction work like working in confined spaces and working at heights.