SWMS - Deck Builder Template
Template for SWMS - Deck Builder. Customize this template for your specific needs.
Professional Review Required
This document involves significant legal, financial, or compliance considerations. You must have a qualified professional review and approve this document before use. Do not rely on this template as legal advice.
Document: SWMS - Deck Builder
Template Preview
Version 1 • Last updated 7/30/2026
Safe Work Method Statement (SWMS)
Company/Business Name: [COMPANY NAME] ABN: [ABN] Job Title: Deck Builder Location of Works: [SITE ADDRESS] Date Prepared: [DATE] Date of Review: [DATE]
1. Details of High-Risk Construction Work
Is this High-Risk Construction Work? [YES/NO] Note: Work is high-risk if it involves a fall risk over 2m, excavation, or use of powered mobile plant.
Description of Work: [Provide a brief description of the deck to be built. Include size, height from ground, material type (timber/steel/composite), and site specifics like slope or access issues.]
Site Specifics:
- Ground Conditions: [e.g. Concrete, grass, clay, sloping]
- Public Access: [e.g. Adjacent to footpath, school, private property]
- Overhead Hazards: [e.g. Powerlines, trees]
- Underground Services: [e.g. Dial Before You Dig reference number]
2. Persons Responsible
Principal Contractor: [NAME] Site Supervisor: [NAME] Emergency Contact: [NAME] - [PHONE NUMBER]
3. Hazard Identification and Risk Assessment
| Job Step / Task | Potential Hazards | Risks (H/M/L) | Existing Controls | Initial Risk Rating (H/M/L) |
|---|---|---|---|---|
| Site Setup & Delivery | manual handling, vehicle movement, uneven ground | strains, crush injuries | traffic management, PPE | [RATING] |
| Excavation for Footings | underground services, collapse of excavation, falls | electric shock, entrapment, falls | Dial Before You Dig, battering of banks | [RATING] |
| Setting Out & Levelling | trip hazards, tool use, UV radiation | cuts, eye damage, skin cancer | hats, sunscreen, tool inspection | [RATING] |
| Installing Bearers & Joists | working at heights, falling objects, manual handling | falls, crush injuries | scaffolding, edge protection, mechanical aids | [RATING] |
| Fixing Decking Boards | noise, nail gun injuries, falls | hearing loss, puncture wounds | ear muffs, sequential trigger nail guns, fall protection | [RATING] |
| Stair Construction & Handrails | falls, unstable structure, incorrect height | serious injury, fatality | temp barriers, compliance with AS 1657 | [RATING] |
| Cutting & Finishing | dust, noise, kickback from saws | respiratory disease, hearing loss, amputation | dust extraction, RCDs, push sticks | [RATING] |
| Clean Up & Waste Removal | manual handling, sharps, fatigue | cuts, strains | bins, teamwork | [RATING] |
4. Control Measures
Hierarchy of Controls
1. Elimination
- Can the work be done from the ground? (e.g. pre-fabricating sections)
2. Substitution
- Use lighter materials where possible to reduce manual handling.
- Use battery operated tools to reduce trip hazards from cords.
3. Engineering
- Fall Protection: Install perimeter scaffolding or edge protection before work commences at height.
- Mechanical Aids: Use pallet jacks, trolleys, or cranes to move heavy timbers.
- Electrical: Use Portable Residual Current Devices (RCDs) on all power leads.
4. Administrative
- Signage: Display mandatory warning signs (PPE, No Entry, Height Work).
- Induction: All workers must complete site induction.
- Exclusion Zones: Keep non-essential personnel away from work zones.
- Weather: Stop work during high winds or electrical storms.
- Manual Handling: Store materials at waist height to minimize bending.
5. Personal Protective Equipment (PPE)
- Safety Helmet (AS/NZS 1801)
- High Visibility Clothing (AS/NZS 4602)
- Safety Boots (AS/NZS 2210)
- Eye Protection (AS/NZS 1337)
- Hearing Protection (AS/NZS 1270)
- Cut Resistant Gloves (when handling timber)
- Sun Protection (Hat, sunscreen, long sleeves)
- Dust Mask (P2) when cutting or sanding
5. Safe Work Method Sequence
Step 1: Site Setup & Induction
- [Describe arrival, parking, and site perimeter setup]
- [Describe tool and equipment inspection checklist]
- [Describe the induction process for workers]
Step 2: Material Handling
- [Describe how materials are offloaded and moved to the work area]
- [Describe stacking of materials to ensure stability]
Step 3: Construction of Substructure
- [Describe marking out and excavation for stump holes]
- [Describe concreting stumps and ensuring set time]
- [Describe installation of bearers and joists]
Step 4: Decking Surface
- [Describe installation of boards from a stable platform]
- [Describe nailing/screwing patterns to prevent squeaks]
Step 5: Finishing
- [Describe installation of handrails and balustrades to meet NCC/BCA]
- [Describe sanding and coating processes]
6. Emergency Procedures
Fire: [Instruction on location of extinguishers and assembly point] First Aid: [Location of First Aid Kit and name of First Aid Officer] Serious Injury: [Call 000, do not move patient unless in danger] Site Contact: [NAME] - [PHONE NUMBER] Nearest Hospital: [HOSPITAL NAME AND ADDRESS]
7. Training and Competency
Required Licences/Certificates:
- White Card (General Construction Induction)
- High Risk Work Licence (if using forklift/boom)
- Scaffolding Ticket (if erecting scaffolding > 4m)
Tool Specific Training:
- Nail Guns (Manufacturer training)
- Circular Saws (Competent person check)
8. Review and Monitoring
This SWMS will be reviewed:
- When a change occurs to the work method.
- When a new hazard is identified.
- If an incident or near miss occurs.
- At least every 2 years or sooner if legislation changes.
Monitoring:
- [NAME] will conduct regular site inspections to ensure compliance.
9. Sign-Off
I have read and understood the contents of this SWMS. I agree to follow all control measures.
| Worker Name | Signature | Date |
|---|---|---|
| [WORKER 1] | [SIGN] | [DATE] |
| [WORKER 2] | [SIGN] | [DATE] |
| [WORKER 3] | [SIGN] | [DATE] |
| [WORKER 4] | [SIGN] | [DATE] |
Principal Contractor / PCBU Representative: Name: [NAME] Signature: ______________________ Date: ______________________
About this Template
Part of the SWMS - Deck Builder document collection
Document Type
SWMS - Deck Builder
Use this Safe Work Method Statement for building residential and commercial timber, steel, or composite decks. It applies when working at heights over 2 metres.