SWMS - Deck Builder Template

Template for SWMS - Deck Builder. Customize this template for your specific needs.

Professional Review Required

This document involves significant legal, financial, or compliance considerations. You must have a qualified professional review and approve this document before use. Do not rely on this template as legal advice.

Document: SWMS - Deck Builder

Template Preview

Version 1 • Last updated 7/30/2026

Safe Work Method Statement (SWMS)

Company/Business Name: [COMPANY NAME] ABN: [ABN] Job Title: Deck Builder Location of Works: [SITE ADDRESS] Date Prepared: [DATE] Date of Review: [DATE]

1. Details of High-Risk Construction Work

Is this High-Risk Construction Work? [YES/NO] Note: Work is high-risk if it involves a fall risk over 2m, excavation, or use of powered mobile plant.

Description of Work: [Provide a brief description of the deck to be built. Include size, height from ground, material type (timber/steel/composite), and site specifics like slope or access issues.]

Site Specifics:

  • Ground Conditions: [e.g. Concrete, grass, clay, sloping]
  • Public Access: [e.g. Adjacent to footpath, school, private property]
  • Overhead Hazards: [e.g. Powerlines, trees]
  • Underground Services: [e.g. Dial Before You Dig reference number]

2. Persons Responsible

Principal Contractor: [NAME] Site Supervisor: [NAME] Emergency Contact: [NAME] - [PHONE NUMBER]

3. Hazard Identification and Risk Assessment

Job Step / TaskPotential HazardsRisks (H/M/L)Existing ControlsInitial Risk Rating (H/M/L)
Site Setup & Deliverymanual handling, vehicle movement, uneven groundstrains, crush injuriestraffic management, PPE[RATING]
Excavation for Footingsunderground services, collapse of excavation, fallselectric shock, entrapment, fallsDial Before You Dig, battering of banks[RATING]
Setting Out & Levellingtrip hazards, tool use, UV radiationcuts, eye damage, skin cancerhats, sunscreen, tool inspection[RATING]
Installing Bearers & Joistsworking at heights, falling objects, manual handlingfalls, crush injuriesscaffolding, edge protection, mechanical aids[RATING]
Fixing Decking Boardsnoise, nail gun injuries, fallshearing loss, puncture woundsear muffs, sequential trigger nail guns, fall protection[RATING]
Stair Construction & Handrailsfalls, unstable structure, incorrect heightserious injury, fatalitytemp barriers, compliance with AS 1657[RATING]
Cutting & Finishingdust, noise, kickback from sawsrespiratory disease, hearing loss, amputationdust extraction, RCDs, push sticks[RATING]
Clean Up & Waste Removalmanual handling, sharps, fatiguecuts, strainsbins, teamwork[RATING]

4. Control Measures

Hierarchy of Controls

1. Elimination

  • Can the work be done from the ground? (e.g. pre-fabricating sections)

2. Substitution

  • Use lighter materials where possible to reduce manual handling.
  • Use battery operated tools to reduce trip hazards from cords.

3. Engineering

  • Fall Protection: Install perimeter scaffolding or edge protection before work commences at height.
  • Mechanical Aids: Use pallet jacks, trolleys, or cranes to move heavy timbers.
  • Electrical: Use Portable Residual Current Devices (RCDs) on all power leads.

4. Administrative

  • Signage: Display mandatory warning signs (PPE, No Entry, Height Work).
  • Induction: All workers must complete site induction.
  • Exclusion Zones: Keep non-essential personnel away from work zones.
  • Weather: Stop work during high winds or electrical storms.
  • Manual Handling: Store materials at waist height to minimize bending.

5. Personal Protective Equipment (PPE)

  • Safety Helmet (AS/NZS 1801)
  • High Visibility Clothing (AS/NZS 4602)
  • Safety Boots (AS/NZS 2210)
  • Eye Protection (AS/NZS 1337)
  • Hearing Protection (AS/NZS 1270)
  • Cut Resistant Gloves (when handling timber)
  • Sun Protection (Hat, sunscreen, long sleeves)
  • Dust Mask (P2) when cutting or sanding

5. Safe Work Method Sequence

Step 1: Site Setup & Induction

  1. [Describe arrival, parking, and site perimeter setup]
  2. [Describe tool and equipment inspection checklist]
  3. [Describe the induction process for workers]

Step 2: Material Handling

  1. [Describe how materials are offloaded and moved to the work area]
  2. [Describe stacking of materials to ensure stability]

Step 3: Construction of Substructure

  1. [Describe marking out and excavation for stump holes]
  2. [Describe concreting stumps and ensuring set time]
  3. [Describe installation of bearers and joists]

Step 4: Decking Surface

  1. [Describe installation of boards from a stable platform]
  2. [Describe nailing/screwing patterns to prevent squeaks]

Step 5: Finishing

  1. [Describe installation of handrails and balustrades to meet NCC/BCA]
  2. [Describe sanding and coating processes]

6. Emergency Procedures

Fire: [Instruction on location of extinguishers and assembly point] First Aid: [Location of First Aid Kit and name of First Aid Officer] Serious Injury: [Call 000, do not move patient unless in danger] Site Contact: [NAME] - [PHONE NUMBER] Nearest Hospital: [HOSPITAL NAME AND ADDRESS]

7. Training and Competency

Required Licences/Certificates:

  • White Card (General Construction Induction)
  • High Risk Work Licence (if using forklift/boom)
  • Scaffolding Ticket (if erecting scaffolding > 4m)

Tool Specific Training:

  • Nail Guns (Manufacturer training)
  • Circular Saws (Competent person check)

8. Review and Monitoring

This SWMS will be reviewed:

  • When a change occurs to the work method.
  • When a new hazard is identified.
  • If an incident or near miss occurs.
  • At least every 2 years or sooner if legislation changes.

Monitoring:

  • [NAME] will conduct regular site inspections to ensure compliance.

9. Sign-Off

I have read and understood the contents of this SWMS. I agree to follow all control measures.

Worker NameSignatureDate
[WORKER 1][SIGN][DATE]
[WORKER 2][SIGN][DATE]
[WORKER 3][SIGN][DATE]
[WORKER 4][SIGN][DATE]

Principal Contractor / PCBU Representative: Name: [NAME] Signature: ______________________ Date: ______________________

Use in GeneratorView Guide

About this Template

Part of the SWMS - Deck Builder document collection

Document Type

SWMS - Deck Builder

Use this Safe Work Method Statement for building residential and commercial timber, steel, or composite decks. It applies when working at heights over 2 metres.

Complexity

complex

Format