SWMS - Drain Layer Template

Template for SWMS - Drain Layer. Customize this template for your specific needs.

Professional Review Required

This document involves significant legal, financial, or compliance considerations. You must have a qualified professional review and approve this document before use. Do not rely on this template as legal advice.

Document: SWMS - Drain Layer

Template Preview

Version 1 • Last updated 7/30/2026

COMPANY DETAILS

Company Name: [Company Name] ABN: [ABN] Address: [Company Address]

PROJECT / JOB DETAILS

Job Title / Description: [Job Title] Site Address: [Site Address] Date of Work: [Start Date] to [End Date] Principal Contractor: [Principal Contractor Name] SWMS Number: [Number]

HIGH RISK CONSTRUCTION WORK CHECKLIST

Confirm which High Risk Construction Work (HRCW) applies to this job:

  • Excavation deeper than 1.5m
  • Work in or near a shaft or trench deeper than 1.5m
  • Work in or near a confined space
  • Work with or near asbestos
  • Work near overhead or underground electric lines
  • Work on or near a road

HAZARDS AND RISKS

Task: [e.g., Excavating trench for sewer line]

HazardRiskBefore ControlsRisk Rating (H/M/L)Control MeasuresAfter ControlsRisk Rating (H/M/L)
Ground collapseBurial, crushingM1. Obtain Dial Before You Dig plans. 2. Use locator (C.A.T) to scan area. 3. Implement shoring, benching or battering as per engineer specs. 4. Install batters at 1:1 ratio if space permits. 5. Keep spoil pile at least 1m from trench edge.L
Underground ServicesElectrocution, explosion, gas leakH1. Verify all services. 2. Use non-destructive digging (hydro vacuum) within 1m of marked services. 3. Permit to work obtained for high voltage assets.L
Manual HandlingMusculoskeletal injuryM1. Use mechanical aids (e.g., crane, pipe hoist). 2. Rotate tasks. 3. Lift loads within safe limits. 4. Two person lift for heavy pipes.L
Hazardous AtmosphereAsphyxiation, poisoningH1. Conduct atmospheric testing for Oxygen, H2S and CO before entry. 2. Ensure continuous ventilation if working in live sewer. 3. Use respiratory protection if required.L
Plant and MachineryStruck by, caught betweenH1. Exclude workers from exclusion zone around excavator. 2. Use spotter for reversing vehicles. 3. Plant fitted with reversing alarm and signals. 4. Traffic management plan in place.L

HIERARCHY OF CONTROLS

1. Elimination: Can the drain be laid using an alternative method that does not require deep excavation? 2. Substitution: Use lighter weight piping materials. 3. Engineering: Use trench shields (shields) to support trench walls. 4. Administrative: Implement traffic management, exclusion zones, and regular toolbox talks. 5. PPE: Use high visibility clothing, safety boots, hard hats, and gloves.

PERSONAL PROTECTIVE EQUIPMENT (PPE)

  • Safety Helmet (Class 1 or 2)
  • High Visibility Clothing (Class D or N)
  • Safety Boots (Steel cap/composite)
  • Safety Glasses or Goggles
  • Gloves (Suitable for handling pipes)
  • Hearing Protection (Class 4 or 5)
  • Sun Protection
  • Respiratory Protection (if required)
  • High visibility vest (worn at all times)

EMERGENCY PROCEDURES

Location of First Aid Kit: [Location] Location of Emergency Assembly Point: [Location] Nearest Hospital: [Hospital Name and Address] Emergency Contacts: 000

Trench Collapse Procedure:

  1. Stop work immediately.
  2. Do not enter the trench to rescue.
  3. Call emergency services (000).
  4. Secure the area.
  5. Ventilate if necessary.

SAFE WORK METHOD STATEMENT SIGN OFF

I acknowledge that I have read and understand the contents of this SWMS.

NameSignatureDateRole
[Worker Name][Date]Drain Layer
[Worker Name][Date]Labourer
[Worker Name][Date]Plant Operator

PCBU / Site Manager Declaration: I confirm this SWMS has been reviewed and is adequate for the work to be performed. Name: [Manager Name] Signature: ________________ Date: [Date]

Review Date: This SWMS is valid until [Date] or earlier if site conditions change.

Use in GeneratorView Guide

About this Template

Part of the SWMS - Drain Layer document collection

Document Type

SWMS - Drain Layer

This SWMS is required for excavation work deeper than 1.5 metres and trenching for stormwater or sewer systems. It manages risks like ground collapse, underground services, and hazardous atmospheres.