SWMS - Masonry Worker (General) Template

Template for SWMS - Masonry Worker (General). Customize this template for your specific needs.

Professional Review Required

This document involves significant legal, financial, or compliance considerations. You must have a qualified professional review and approve this document before use. Do not rely on this template as legal advice.

Document: SWMS - Masonry Worker (General)

Template Preview

Version 1 • Last updated 7/30/2026

SAFE WORK METHOD STATEMENT (SWMS)

Company / Project Details

Company Name: [COMPANY NAME] ABN: [ABN] Project Address: [SITE ADDRESS] Date of Preparation: [DATE] Work Activity: General Masonry Work (Bricklaying/Blocklaying/Stonework)

Step 1: Describe the High Risk Construction Work

High Risk Construction Work ChecklistYes/No
Work involving a risk of a person falling more than 2 metres[YES/NO]
Work carried out on or near pressurised gas distribution mains or piping[YES/NO]
Work carried out on or near chemical, fuel or refrigerant lines[YES/NO]
Work on or near energised electrical installations[YES/NO]
Work involving mobile plant[YES/NO]
Work in or near a confined space[YES/NO]
Work in or near a shaft or trench deeper than 1.5 metres[YES/NO]
Work involving demolition[YES/NO]
Work involving asbestos[YES/NO]
Work in an area that may have a contaminated or flammable atmosphere[YES/NO]
Work involving tilt-up or precast concrete[YES/NO]
Work in an area with movement of powered mobile plant[YES/NO]
Work on a telecommunications tower[YES/NO]
Work near traffic[YES/NO]

Description of Work: [Brief description of the specific masonry tasks, e.g., Construction of external brick walls, installation of concrete block retaining walls, laying pavers, mixing mortar.]

Step 2: Hazard Identification

Step/TaskWhat is the Hazard?How could it cause harm?Risk RatingInitial Controls
1. Delivery of MaterialsReversing vehicles/mobile plantCrushing of pedestrians[H/M/L]Spotters, exclusion zones, barriers
2. Manual Handling (Unloading bricks/blocks)Repetitive lifting, heavy loadsMusculoskeletal injury (back/shoulders)[H/M/L]Mechanical aids, team lifting, rotation
3. Work at Heights (Scaffolding) / Agresso deckFall from heightSerious injury or death[H/M/L]Scaff erected by licenced person, edge protection, full planking
4. Mixing Mortar / CementCement dust, skin contactDermatitis, respiratory issues[H/M/L]PPE (gloves, long sleeves), P2 mask, wash stations
5. Cutting Bricks/BlocksSilica dust, noise, vibrationSilicosis, hearing loss, HAVS[H/M/L]Wet cutting, dust extraction, P2 mask, ear muffs, breaks
6. Falling ObjectsTools, bricks, debris fallingHead injury, fatality[H/M/L]Toe boards, tool lanyards, exclusion zones below
7. Using Electrical ToolsDamaged cords, waterElectric shock[H/M/L]RCD safety switches, visual inspection, dry area
8. Working Near Traffic/PublicPublic interaction, vehiclesCollision[H/M/L]Traffic management plan, bollards, signage

Step 3: Implementation of Control Measures

Hierarchy of Controls applied to key tasks:

1. Working at Heights

  • Elimination: Prefabricate walls at ground level where possible.
  • Substitution: Use scissor lifts instead of ladders.
  • Isolation: Install guardrails (top, mid, toe boards) on scaffolding.
  • Engineering: Use scaffold tag system to ensure integrity.
  • Administrative: SWMS induction, only work in good weather.
  • PPE: Safety helmet, non-slip safety boots.

2. Silica Dust (Cutting)

  • Elimination: Order bricks/blocks to exact size to minimise cutting.
  • Substitution: Use low silica materials if available.
  • Isolation: Cut in designated ventilated area or away from workers.
  • Engineering: Use on-tool water suppression or local exhaust ventilation.
  • Administrative: Keep area wet, clean up with vacuum (H-class), do not dry sweep.
  • PPE: Fit-tested P2 respirator or higher.

3. Manual Handling

  • Elimination: Use bulk delivery systems.
  • Substitution: Use lighter weight blocks (e.g., Hebel) where structural capacity allows.
  • Isolation: Store materials close to work area to reduce travel distance.
  • Engineering: Use brick saws, trolleys, pallet jacks, forklifts.
  • Administrative: Job rotation, training in safe lifting techniques.
  • PPE: Safety boots with good support, gloves.

Step 4: Personal Protective Equipment (PPE)

Minimum PPE Required for all workers:

  • High visibility clothing (Class D or N)
  • Safety helmet (AS/NZS 1801)
  • Safety boots (Steel toe/composite, AS/NZS 2210)
  • Protective gloves (Cut resistant or specific for cement)
  • Sun protection (Hat, sunscreen, long sleeve shirt)

Task Specific PPE:

  • Eye protection (Safety glasses or goggles)
  • Hearing protection (Class 5, AS/NZS 1270)
  • Respiratory protection (P2/N95 for silica dust)
  • Safety use and lanyard (if using travel restraint)
  • Disposable overalls (for cutting/cleaning)

Step 5: Emergency Procedures

Incident Reporting: Contact Site Supervisor immediately on [SUPERVISOR PHONE].

First Aid: Location of First Aid Kit: [LOCATION] Location of Eyewash Station: [LOCATION] Nearest Hospital: [HOSPITAL NAME & ADDRESS]

Fire: Contact 000. Location of Fire Extinguishers: [LOCATIONS]. Assembly Point: [ADDRESS].

Step 6: Review and Monitoring

Review Triggers:

  • Incident or near miss occurs.
  • New equipment or machinery introduced.
  • Changes to work environment or scope of works.
  • A worker or health and safety representative requests a review.

Review Date: [DATE OR 'Prior to work commencing if scope changes']

Signatures

By signing below, I acknowledge I have read and understood this SWMS and will work in accordance with its controls.

NameRoleSignatureDate
Worker Representative[NAME][SIGN][DATE]
Principal Contractor/PCBU[NAME][SIGN][DATE]
Worker 1[NAME][SIGN][DATE]
Worker 2[NAME][SIGN][DATE]
Worker 3[NAME][SIGN][DATE]
Worker 4[NAME][SIGN][DATE]

Keep this SWMS on site at all times while work is being carried out.

Use in GeneratorView Guide

About this Template

Part of the SWMS - Masonry Worker (General) document collection