SWMS - Pergola / Carport Builder Template
Template for SWMS - Pergola / Carport Builder. Customize this template for your specific needs.
Professional Review Required
This document involves significant legal, financial, or compliance considerations. You must have a qualified professional review and approve this document before use. Do not rely on this template as legal advice.
Document: SWMS - Pergola / Carport Builder
Template Preview
Version 1 • Last updated 7/30/2026
SAFE WORK METHOD STATEMENT (SWMS)
Company Details
Company Name: [COMPANY NAME] ABN: [ABN] Address: [ADDRESS] Contact Person: [NAME] Phone: [PHONE NUMBER]
Job Details
Job Address/Location: [SITE ADDRESS] Client Name: [CLIENT NAME] Date of Work: [START DATE] to [END DATE] Supervisor: [NAME]
High Risk Construction Work Activity
Description: [e.g., Construction of a timber pergola and flat roof carport involving post installation, beam fitting, and roofing] Specific High Risk Tasks:
- Working at heights over 2 metres
- Operating powered mobile plant (e.g., excavator for footings)
- Structural alterations
Step by Step Tasks, Hazks and Controls
| Step / Task | Hazards & Risks | Risk Rating (Before) | Control Measures (Hierarchy of Controls) | Risk Rating (After) |
|---|---|---|---|---|
| 1. Site Set-up & Delivery | - Tripping hazards from materials<br>- Slips/trips on uneven ground<br>- Manual handling injuries | M | 1. Inspect ground for trip hazards.<br>2. Establish exclusion zone for delivery.<br>3. Store materials flat and supported.<br>4. Use team lifting techniques for heavy packs. | L |
| 2. Service Location & Excavation | - Striking underground services (gas/electric)<br>- Excavator rollover<br>- Collapse of excavation trench | H | 1. Dial 1100 (Before You Dig Australia) to locate services.<br>2. Use hand digging (potholing) near services.<br>3. Use excavator with ROPS on stable ground.<br>4. Use battering or trench shields for holes over 1.5m.<br>5. Keep public away from machinery. | L |
| 3. Installation of Posts / Footings | - Falls from ladder<br>- Crush injuries from dropping posts<br>- Chemical exposure from concrete | M | 1. Use scaffolding or Raised Work Platform (EWP) for heights.<br>2. Securely ladder at top and tie off.<br>3. Wear concrete gloves and goggles.<br>4. Use mechanical aids to lift posts (e.g., Hiab). | L |
| 4. Assembly of Beams & Rafters | - Falling objects<br>- Falling from height<br>- Manual handling strain | H | 1. Use crane or telehandler to lift beams into position.<br>2. Tag lines used to control load.<br>3. Fall restraint usees secured to anchor point.<br>4. Work from scaffold platform if possible.<br>5. No working under suspended loads. | L |
| 5. Roof Installation (Battens & Sheeting) | - Falls through roof frame<br>- Falling off edge<br>- Slipping on roof surface | H | 1. Install fall protection perimeter guardrail or scaffold.<br>2. Use safety use with fall arrest system.<br>3. Use roof ladders or crawl boards.<br>4. Clean roof surface of debris/oil.<br>5. Secure materials to prevent wind blow-off. | L |
| 6. Clean Up & Demobilisation | - Manual handling<br>- Debris on site<br>- Traffic during loading | L | 1. Remove waste regularly.<br>2. Use mechanical aids for loading bins.<br>3. Use traffic controller if accessing roadway. | L |
Personal Protective Equipment (PPE)
Mandatory for all workers:
- Safety Helmet (AS/NZS 1801)
- High Visibility Clothing (Class D/N)
- Safety Boots (Steel cap/composite, AS/NZS 2210)
- Sun Protection (Hat, sunscreen, long sleeves)
Task Specific PPE:
- Safety Glasses / Face Shield (for cutting/grinding)
- Hearing Protection (Class 5, for power tools)
- Cut Resistant Gloves (handling metal)
- Safety Use & Lanyard (Fall arrest/restraint)
- Dust Mask (P2/N95)
Emergency Procedures
Nearest Hospital: [HOSPITAL NAME] - [PHONE NUMBER]
Fire: Dial 000. Locate nearest fire extinguisher [LOCATION].
Accident/Injury:
- Secure the scene to prevent further injury.
- Administer First Aid if qualified.
- Call Supervisor and Emergency Services (000).
- Do not move patient unless necessary for safety.
First Aid Officer: [NAME] First Aid Kit Location: [LOCATION]
Consultation & Sign-off
Worker Declaration: I have read and understood the contents of this SWMS. I agree to follow all control measures listed.
| Print Name | Signature | Date |
|---|---|---|
| [WORKER 1] | [DATE] | |
| [WORKER 2] | [DATE] | |
| [WORKER 3] | [DATE] |
PCBU / Principal Contractor Declaration: I accept this SWMS and will ensure the control measures are implemented and maintained.
| Print Name | Signature | Date |
|---|---|---|
| [SUPERVISOR] | [DATE] |
Review Schedule
This SWMS must be reviewed:
- If an incident occurs
- If a control measure fails
- If work conditions change
- At least every 2 years
Last Reviewed Date: [DATE]
About this Template
Part of the SWMS - Pergola / Carport Builder document collection
Document Type
SWMS - Pergola / Carport Builder
This SWMS is required for builders constructing pergolas, carports, and outdoor structures. It covers high-risk construction work including working at heights, excavating footings, and operating mobile plant.