SWMS - Refrigeration Mechanic Template

Template for SWMS - Refrigeration Mechanic. Customize this template for your specific needs.

Professional Review Required

This document involves significant legal, financial, or compliance considerations. You must have a qualified professional review and approve this document before use. Do not rely on this template as legal advice.

Document: SWMS - Refrigeration Mechanic

Template Preview

Version 1 • Last updated 7/30/2026

SAFE WORK METHOD STATEMENT (SWMS)

Company / Project Details

Company Name: [ENTER COMPANY NAME] ABN: [ENTER ABN] Project / Site Address: [ENTER ADDRESS] Date of Preparation: [ENTER DATE]

High-Risk Construction Work Details

Activity: Refrigeration and Air Conditioning Installation and Maintenance Specific High-Risk Tasks: [SELECT ALL THAT APPLY - e.g., Work at heights >2m, Electrical work, Use of hazardous chemicals, Confined spaces]

Job Steps / Task Breakdown

  1. Pre-start Inspection and Site Induction
  2. Manual Handling (Unloading plant and equipment)
  3. Install Scaffolding or Access Equipment (if required)
  4. Mounting Outdoor Condensing Units (Work at Heights)
  5. Installation of Indoor Fan Coil Units (Ceiling/Wall)
  6. Pipe Brazing and Soldering (Use of Oxy-Acetylene/LPG)
  7. Electrical Connections and Testing
  8. Refrigerant Charging and Commissioning
  9. De-installation / Refrigerant Recovery
  10. Clean Up and Demobilization

Hazard Identification, Risk Assessment and Control Measures

Step / TaskHazard IdentificationPotential HarmRisk Rating (Before Controls)Control Measures (Hierarchy of Controls)Risk Rating (After Controls)
1. Pre-startUneven ground, hidden services, site trafficSprains, cuts, electrocutionM1. Inspect site for hazards. <br> 2. Obtain underground service plans (Dial Before You Dig). <br> 3. Wear Hi-Vis clothing. <br> 4. Implement traffic management plan.L
2. Manual HandlingLifting heavy units (Compressors/Cassettes)Back injury, crush injuryH1. Assess weight of load. <br> 2. Use mechanical aids (trolley, hoist, forklift). <br> 3. Use team lifting techniques for loads over 15kg. <br> 4. Keep load close to body.M
3. Work at HeightsFalling from ladders, scaffolding, roofDeath, serious fractureE1. Use scaffold with edge protection as primary control. <br> 2. If scaffold not practicable, use Elevating Work Platform (EWP). <br> 3. Use Travel Restraint system. <br> 4. Fall arrest use only as last resort. <br> 5. Inspect ladders/tag them.L
4. Electrical WorkExposed live parts, damaged cablesElectrocution, deathE1. Isolate power supply at the main board (Lock Out / Tag Out). <br> 2. Test for dead using approved voltage tester. <br> 3. Use Residual Current Devices (RCDs) on portable tools. <br> 4. Only licensed electricians perform hard-wiring.L
5. Brazing/SolderingFlashback, burns, fire, fumesBurns, eye damage, respiratory issuesH1. Check for flammable materials before lighting. <br> 2. Ensure flashback arrestors fitted to torches. <br> 3. Use correct PPE (safety glasses, leather gloves). <br> 4. Ensure adequate ventilation. <br> 5. Have fire extinguisher nearby.L
6. Refrigerant HandlingHigh pressure gas release, chemical exposureSkin freeze, asphyxiation, frostbiteH1. Wear safety glasses and gloves. <br> 2. Check cylinder dates and condition. <br> 3. Do not overfill cylinders. <br> 4. Use leak detector. <br> 5. Recover refrigerant using recovery machine (do not vent).M
7. Confined SpacesLack of oxygen, engulfmentUnconsciousness, deathE1. Obtain confined space entry permit if required. <br> 2. Test atmosphere (Oxygen levels, LEL). <br> 3. Ensure ventilation. <br> 4. Standby person present.L

Risk Key: E = Extreme, H = High, M = Medium, L = Low

Personal Protective Equipment (PPE)

  • Safety Helmet (Hard Hat)
  • High Visibility Vest / Clothing
  • Safety Boots (Steel Cap)
  • Safety Glasses / Goggles
  • Cut Resistant Gloves
  • Hearing Protection
  • Use (if work at heights)
  • Respiratory Protection (if brazing in confined areas)

Emergency Procedures

  • Fire: Raise alarm, call 000, use extinguisher if safe to do so.
  • Injury: Administer First Aid, call 000 if serious.
  • Gas Leak: Isolate area, ventilate, do not use ignition sources.
  • Nearest Hospital: [ENTER HOSPITAL NAME AND ADDRESS]
  • Emergency Assembly Point: [ENTER LOCATION]

Training and Competency

  • White Card: [ ] Verified
  • Refrigeration License (ARC): [ ] Verified
  • Electrical License: [ ] Verified (if applicable)
  • Working at Heights Training: [ ] Verified
  • EWP License: [ ] Verified (if applicable)
  • SWMS Induction: All workers have read and understood this SWMS.

Sign Off

I acknowledge that I have read and understood the contents of this SWMS and agree to abide by the control measures listed.

Worker NameSignatureDate
[WORKER 1][SIGN][DATE]
[WORKER 2][SIGN][DATE]
[WORKER 3][SIGN][DATE]

PCBU / Principal Contractor Representative:

Name: [NAME] ______________________ Signature: [SIGN] ______________________ Date: [DATE] ______________________

Use in GeneratorView Guide

About this Template

Part of the SWMS - Refrigeration Mechanic document collection

Document Type

SWMS - Refrigeration Mechanic

This SWMS is required for refrigeration mechanics performing high-risk construction work, such as installing or splitting AC units on roofs, handling hydrocarbon refrigerants, or working near live electrical panels.

Complexity

complex

Format

form