PropoDoc provides self-help document templates and tools. It is not a law firm and does not provide legal advice. Learn more.
Skip to main content
Template
Free

SWMS - Roadworks / Civil Construction Template

Template for SWMS - Roadworks / Civil Construction. Customize this template for your specific needs.

Professional Review Required

This document involves significant legal, financial, or compliance considerations. You must have a qualified professional review and approve this document before use. Do not rely on this template as legal advice.

Document: SWMS - Roadworks / Civil Construction

Template Preview

Version 1 • Last updated 7/30/2026

Safe Work Method Statement (SWMS)

Company Details

Company Name: [COMPANY NAME] ABN: [ABN] Address: [ADDRESS]

Project / Job Details

Project Name: [PROJECT NAME] Job Number: [JOB NUMBER] Site Address: [SITE ADDRESS] Date of Issue: [DATE]

High Risk Construction Work (HRCW)

This SWMS applies to the following High Risk Construction Work (Check all that apply):

  • Work that involves a risk of a person falling more than 2 metres
  • Excavation work (including trenching) deeper than 1.5 metres
  • Work in or near a confined space
  • Work in or near a shaft or trench deeper than 1.5 metres
  • Work on or near pressurised gas distribution mains or piping
  • Work on or near chemical, fuel or refrigerant lines
  • Work on or near energised electrical installations or services
  • Work in an area that may have a contaminated or flammable atmosphere
  • Work near traffic, mobile plant (e.g. roadworks)
  • Work near or on water
  • Work involving demolition
  • Work involving structural alterations
  • Work involving the use of explosives
  • Work on or adjacent to railway lines
  • Work in an area at a workplace in which there is movement of powered mobile plant

Description of Tasks

[List the specific tasks to be performed, e.g., Installation of traffic management devices, Excavation of trench for drainage, Placement of road base, Compaction of asphalt]

Hazard Identification and Risk Assessment

Step / TaskPotential HazardWho is at Risk?Risk Rating (Before Controls)HML
[e.g., Setting up traffic control][e.g., Struck by vehicle][e.g., Traffic controllers, public][H/M/L]
[e.g., Excavation][e.g., Ground collapse][e.g., Plant operator, ground workers][H/M/L]
[e.g., Operating roller][e.g., Rollover, noise][e.g., Operator][H/M/L]
[e.g., Breaking concrete][e.g., Dust, silica, vibration][e.g., Labourer][H/M/L]
[e.g., Service locating][e.g., Strike cable / pipe][e.g., Locator][H/M/L]

Risk Control Measures

For each task listed above, implement controls using the Hierarchy of Controls.

Task 1: [TASK NAME]

Hazard: [HAZARD]

  • Elimination: [Can the hazard be removed?]
  • Substitution: [Can something less hazardous be used?]
  • Engineering: [e.g., Use of concrete barriers, signage, trench shoring]
  • Administrative: [e.g., SWMS briefing, spotters, exclusion zones, permit systems, rotate workers]
  • PPE: [List PPE required]

Task 2: [TASK NAME]

Hazard: [HAZARD]

  • Elimination: [Can the hazard be removed?]
  • Substitution: [Can something less hazardous be used?]
  • Engineering: [e.g., Machine guards, ROPS, dust extraction]
  • Administrative: [e.g., Traffic management plan, pre-start checks]
  • PPE: [List PPE required]

(Repeat for all tasks)

Personal Protective Equipment (PPE)

Mandatory PPE for all workers:

  • High visibility clothing (Class D or N)
  • Safety Helmet (AS/NZS 1801)
  • Safety Boots (AS/NZS 2210.3)
  • Safety glasses or goggles

Task Specific PPE:

  • Hearing protection (Class 5)
  • Gloves
  • Respiratory protection (P2 or higher)
  • High visibility vest with sleeves
  • Sun protection

Emergency Procedures

  • Location of First Aid Kit: [LOCATION]
  • Location of Fire Extinguisher: [LOCATION]
  • Nearest Hospital: [NAME AND ADDRESS]
  • Emergency Contact Person: [NAME] - [PHONE NUMBER]
  • Emergency Services Dial: 000
  • Evacuation Assembly Point: [LOCATION]

Specific Emergency Instructions:

  • For injuries: Stop work, administer first aid, call 000.
  • For service strikes: Stop work immediately, clear area, call service authority.
  • For traffic incidents: Secure scene, divert traffic if safe, call police.

Training and Competency

We confirm that all workers listed in the sign-off section have received the necessary training and instruction to perform the work safely.

  • General Construction Induction (White Card)
  • Traffic Controller Accreditation
  • High Risk Work Licence (e.g., Dogman, Forklift)
  • Confined Space Entry Training
  • Plant Operator Verification of Competency

Review and Revision

This SWMS will be reviewed:

  • Before work commences
  • If there is a change in work procedures
  • If a new hazard is identified
  • If a notifiable incident occurs
  • On a regular basis (every [X] months)

Sign-Off Section

Worker Acknowledgement: I have read and understood the contents of this SWMS. I agree to follow all control measures and use the PPE provided.

NameSignatureDateTrade / Role
[Name][Sign][Date][Role]
[Name][Sign][Date][Role]
[Name][Sign][Date][Role]

Principal Contractor / PCBU Representative: I confirm this SWMS adequately addresses the risks associated with this work.

Name: __________________ Signature: __________________ Date: ________________

Use in GeneratorView Guide

About this Template

Part of the SWMS - Roadworks / Civil Construction document collection

Document Type

SWMS - Roadworks / Civil Construction

Use this SWMS for high-risk roadwork and civil construction tasks including earthmoving, asphalt laying, traffic management, and working near live utilities.

Complexity

complex

Format

form