Fee Proposal
Professional fee proposal with services, pricing, and value summary.
20 free credits on signup — no card needed
About this Document
What Is a Fee Proposal?
A fee proposal is a formal document used by Australian businesses, tradespeople, and consultants to outline the cost of services or work before a contract is signed. It acts as a bridge between an initial discussion and a binding agreement. Unlike a casual conversation or a rough ballpark figure written on the back of a business card, a fee proposal provides a detailed breakdown of what you will do, how much it will cost, and the terms under which you will work.
In the Australian market, clarity is everything. Clients need to know exactly what they are paying for, and you need to protect your profit margins. A well-drafted fee proposal sets clear expectations. It defines the scope of work, the payment schedule, and the timeline. When a client signs this document, it usually forms the basis of the legal contract. This means it is not just a administrative task; it is a critical risk management tool for your business.
The term "fee proposal" is often used interchangeably with "quote," but there is a subtle difference in professional practice. A quote is often a fixed price for a specific job. A fee proposal can be slightly more flexible, often used by consultants or when the scope of work is complex. However, under Australian Consumer Law, if you present a fixed price, you must stick to it. Therefore, the document must be precise about whether the price is fixed or an estimate.
When to Use This Document
You should use a fee proposal whenever you are engaging with a new client or starting a project that involves significant time, materials, or cost. It is a standard requirement for B2B services, construction projects, consulting work, and creative industries.
For tradespeople, a fee proposal is essential for any job that goes beyond minor maintenance. If you are a plumber fixing a leaky tap in ten minutes, a verbal quote might suffice. However, if you are renovating a bathroom or installing a new air conditioning system, you must provide a written proposal. This protects you if the client claims they thought the job included things it did not, such as removing old tiles or painting the walls.
Startups and service-based businesses should use these documents for retainers or project-based work. For example, a marketing agency should use a fee proposal to outline the monthly deliverables and the scope of a campaign. This prevents "scope creep," where the client asks for small extra tasks that eventually eat up your time without extra pay.
There are also legal thresholds in Australia that trigger the requirement for written contracts. In New South Wales, the Home Building Act 1989 requires a comprehensive written contract for residential building work valued over $20,000. While a fee proposal is often the precursor to the formal contract, it must still be accurate and cannot misrepresent the terms of the final agreement. In Victoria, under the Domestic Building Contracts Act 1995, a detailed written contract is required for all domestic building work valued over $10,000.
Using a Fee Proposal Template ensures you capture all necessary details every time, regardless of the industry.
Key Sections and Required Elements
A professional fee proposal needs several specific components to be legally sound and practical. Leaving these sections out leaves you open to disputes and non-payment.
Scope of Services
This is the most important part of the document. You must describe exactly what you will deliver. Be as specific as possible. Instead of writing "install flooring," write "supply and install 20sqm of engineered timber flooring in the hallway, including underlay and trims."
You must also list Exclusions. This is where you state what you are not doing. Common exclusions might include "removal of existing flooring," "painting of skirting boards," or "travel time outside the Sydney metro area." Research from industry bodies like the Master Builders Association shows that ambiguity in the scope is the primary cause of disputes. If you do not exclude it, a client may reasonably assume it is included.
Pricing Schedule
Your pricing must be transparent and comply with Australian Taxation Office (ATO) standards. The schedule should break down the costs into line items. This helps the client understand where their money is going. You might list labour costs, material costs, and subcontractor fees separately.
Crucially, you must address GST. If your business has a turnover of more than $75,000, you are required to be registered for GST. Under the Taxation Administration Act 1953 and Australian Consumer Law, you must clearly state whether the price is inclusive or exclusive of GST. Writing "plus GST" when you are not registered, or failing to mention GST when it is applicable, can lead to legal issues. The total amount must be prominent.
Terms and Conditions
This section is the legal backbone of your proposal. It covers how you work and what happens if things go wrong. Key elements include:
- Payment Terms: Specify when invoices are due, such as "7 days from invoice date" or "progress payments aligned with project milestones."
- Variations: This explains how you will handle changes to the scope. In construction and consulting, it is standard practice to reference "Prime Cost" (PC) items and "Provisional Sums." These are allowances for items where the exact cost is not known at the time of signing, such as specific tiles or excavation costs. Your proposal should state that these will be invoiced at cost plus a margin.
- Defect Liability Period: This sets a timeframe for fixing any issues. Standard forms like AS 4000 often use 13 weeks, but you can choose a period that suits your industry.
Deposit and Mobilisation
It is standard practice to ask for a deposit upfront to secure your place in the schedule and cover initial material costs. However, you must be careful with the amount. In Victoria, the Domestic Building Contracts Act 1995 limits deposits to 10% of the total contract price. While this specific cap is a Victorian regulation, it is good practice across Australia to keep deposits reasonable to avoid claims of unconscionable conduct under the Australian Consumer Law.
Acceptance
You need a clear mechanism for the client to accept the proposal. This should be a designated space for them to sign, print their name, and date the document. You should also include a clause stating, "Work will not commence until this proposal is accepted and the deposit is received." This ensures you are not left working without a binding agreement.
How to Write a Fee Proposal (Step by Step)
Writing a fee proposal does not need to be complicated, but it requires attention to detail. Follow these steps to create a document that looks professional and protects your interests.
Step 1: Gather Your Information
Before you write anything, ensure you have all the necessary details from the client. You need their full contact details, the site address, and a clear understanding of what they want. If you are visiting a site, take notes and photos. These records can help you if there is a disagreement later about the state of the site before you started work.
Step 2: Draft the Scope
Start writing the scope of works. Use clear, plain English. Avoid jargon unless you are certain the client understands it. List the inclusions first. Then, think about what could go wrong or what the client might expect that you do not want to include. List these as exclusions. For example, if you are a gardener, specify if your quote includes green waste removal or if that is an extra cost.
Step 3: Calculate Your Costs
Break down your pricing. Calculate your labour hours, materials, subcontractor costs, and margin. Do not forget to include your overheads, such as insurance, tool maintenance, and administrative time. Once you have your total, check your GST registration status. Add the GST component if required, and label the total clearly as "GST Inclusive" or "Plus GST."
Step 4: Define the Timeline
Clients always want to know when the job will be done. Avoid vague terms like "ASAP" or "promptly." Australian contract law interprets vague timing as requiring completion within a "reasonable time," which is subjective and often leads to disputes. Use specific dates instead. For example, "Commencement: 15 November 2023" and "Completion: 22 November 2023."
Step 5: Add Validity Period
Include a validity date, usually 30 days from the date of the proposal. This protects you from fluctuations in material costs, such as sudden spikes in timber or steel prices. It also prevents the client from coming back to you six months later expecting you to honour a price that is no longer accurate.
Step 6: Include Privacy Notice
If you are collecting personal information, such as the client's name, phone number, or address, you must comply with the Privacy Act 1988. You can include a brief statement in the proposal or refer to your full Privacy Policy. This notice should state why you are collecting the information and who you will disclose it to.
Common Mistakes to Avoid
Even experienced business owners make errors when drafting fee proposals. Avoiding these common pitfalls can save you time and money.
Omitting the Exclusions List
The most frequent error is failing to list what is not included. If a client assumes a task is included because you did not explicitly exclude it, you may be legally bound to do it for free to avoid a breach of contract. Always be explicit about the boundaries of your work.
Ambiguous Timing
Using phrases like "as soon as possible" creates legal ambiguity. If a project is delayed, the client may claim you breached the contract because you didn't finish "promptly." Specific dates protect both parties and provide a clear benchmark for performance.
Ignoring Signatory Authority
If you are dealing with a company or a startup, ensure the person signing the proposal has the authority to bind the business. Under the Corporations Act 2001, a contract signed by an unauthorized employee may be void. Check that you are dealing with a Director or someone with written authority to sign.
Forgetting Cooling-Off Periods
In certain industries, such as door-to-door sales or residential building in some states, clients have statutory cooling-off rights. For example, residential building contracts in Victoria often include a 5-day cooling-off period. Failing to inform the client of these rights in your documentation can result in heavy fines and legal complications.
Mislabelling Estimates
Be very careful with the words you use. If you provide a "Quote," it is generally considered a fixed price. If you provide an "Estimate," it is an approximation. Under the Competition and Consumer Act 2010, misleading a client about the nature of the price is an offence. If the price is likely to change, call it an estimate and explain why.
Legal Considerations (AU)
Operating in Australia means your fee proposals must comply with a range of federal and state laws. Ignorance of these laws is not a valid defence in a dispute.
Australian Consumer Law (ACL)
The ACL applies to all businesses in Australia. Section 18 of the Competition and Consumer Act 2010 prohibits misleading or deceptive conduct. Your proposal must be honest and accurate. You cannot make false claims about the price, quality, or availability of services. Additionally, the Treasury Laws Amendment (More Competition, Better Prices) Act 2022 strengthened protections against unfair contract terms. If your proposal becomes a standard form contract for a small business or consumer, terms that are significantly unbalanced—such as a clause allowing you to unilaterally raise the price without reason—may be void.
State-Based Building Regulations
Building regulations vary by state, so you must check the laws relevant to your location.
- New South Wales: The Home Building Act 1989 regulates residential building work. For jobs over $20,000, you need a comprehensive contract. For jobs between $5,000 and $20,000, a "minor works" contract is required. Your proposal must include your builder's licence number if you are doing regulated work.
- Victoria: The Domestic Building Contracts Act 1995 requires written contracts for work over $10,000. There are specific requirements for insurance warnings and deposit limits (maximum 10%).
Taxation and ASIC Requirements
From a tax perspective, the ATO requires you to be clear about GST. If you are a company, you also need to ensure your proposal includes your Australian Business Number (ABN) and correct legal entity name. This ensures you are compliant with Australian Securities and Investments Commission (ASIC) reporting standards.
Work Health and Safety (WHS)
While not always part of the pricing section, your proposal should acknowledge your WHS obligations. You may need to include a clause stating that you will comply with relevant WHS legislation. This is particularly relevant for tradespeople working on client sites where there are risks associated with asbestos, heights, or electrical work.
Frequently Asked Questions (preview)
Is a fee proposal legally binding?
Yes, once the client signs the fee proposal and you accept that signature, it generally becomes a legally binding contract. It sets out the terms of the agreement between you. To ensure it is enforceable, make sure you have included all essential terms, such as price, scope, and timeline.
What is the difference between a quote and an estimate?
A quote is a fixed price offer. You are legally obligated to complete the work for that price, provided the scope does not change. An estimate is an educated guess of the cost. The final price may be higher or lower. Under Australian Consumer Law, you must clearly label which one you are providing to avoid misleading the client.
Do I need to include my ABN on the proposal?
Yes, it is best practice to include your Australian Business Number (ABN) on all business documents. If you are registered for GST, you must also include the words "Tax Invoice" on the document if you are requesting payment, though a proposal usually precedes the invoice. Including your ABN helps the client verify your business and ensures they can claim the expense if applicable.
Can I increase the price once the proposal is signed?
This depends on your terms. Generally, a fixed price proposal cannot be increased unilaterally. However, you can include a variation clause that allows for price increases if the scope of work changes or if unexpected issues arise, such as hidden structural damage. These variations must be documented and agreed to in writing by the client.
How long should a proposal remain valid?
Most businesses set a validity period of 30 days. This accounts for changes in material costs and your own schedule. After this date, you are not obligated to honour the price, and you may need to issue a revised proposal.
What happens if a client wants to cancel after signing?
This depends on the terms in your proposal and the type of work. In some cases, like residential building in Victoria, the client has a statutory cooling-off period. In other cases, your proposal may specify that the deposit is non-refundable if the client cancels within a certain timeframe. You must ensure your cancellation terms are fair and not considered "unfair contract terms" under the ACL.
Required Sections
Proposal Header
Client name, date, proposal reference, validity.
Understanding of Requirements
Restatement of what the client needs.
Services and Deliverables
What will be delivered and when.
Fee Schedule
Pricing for each service or package.
Next Steps
How to accept the proposal and start work.
Ready to create your document?
Use our free template or generate a custom version tailored to your needs.
20 free credits on signup — no card needed
This document is for informational purposes and serves as a general guide.
Last reviewed: July 27, 2026