Risk Assessment Matrix Example

Example document for Risk Assessment Matrix. Use this as a reference when creating your own.

Professional Review Required

This document involves significant legal, financial, or compliance considerations. You must have a qualified professional review and approve this document before use. Do not rely on this template as legal advice.

Document: Risk Assessment Matrix

Example Document

Last updated 7/30/2026

Risk Assessment Matrix

Business Name: Apex Plumbing Services Date of Assessment: 25 October 2023 Assessor Name: John Smith Location/Worksite: 42 Smith Street, Richmond

Risk Rating Key

LikelihoodDescriptionConsequenceDescriptionRisk ScoreRisk Rating
1Rare1Insignificant1-2Low
2Unlikely2Minor3-6Medium
3Possible3Moderate8-12High
4Likely4Major16-25Extreme
5Certain5Catastrophic

Hazard Assessment Table

Hazard DescriptionWho is at risk?Likelihood (1-5)Consequence (1-5)Risk ScoreInitial Risk RatingControl Measures (Hierarchy of Control)Residual LikelihoodResidual ConsequenceResidual Risk ScoreResidual Risk Rating
Working on roof without edge protectionPlumbers4 (Likely)5 (Catastrophic)20ExtremeInstall temporary edge protection scaffolding (Engineering)2 (Unlikely)5 (Catastrophic)10High
Exposure to silica dust when cutting tilesTiler, Apprentice5 (Certain)4 (Major)25ExtremeUse wet cutting method and attach dust extractor (Engineering)2 (Unlikely)2 (Minor)4Medium
Manual handling of heavy water heaterPlumber3 (Possible)3 (Moderate)9HighUse a trolley or mechanical aid to move heater (Engineering)2 (Unlikely)2 (Minor)4Medium
Noise from drop sawUser, nearby workers5 (Certain)2 (Minor)10HighMandatory hearing protection zones and ear muffs (PPE/Admin)3 (Possible)1 (Insignificant)3Medium

Hierarchy of Controls Reference

  1. Elimination - Physically remove the hazard
  2. Substitution - Replace the hazard
  3. Isolation - Isolate people from the hazard
  4. Engineering Controls - Change the way people work
  5. Administrative Controls - Change the way people work
  6. PPE - Protect the worker with Personal Protective Equipment

Assessor Signature: John Smith

Date: 25/10/2023

Notes

Notes on Key Decisions:

  1. Roof Work (Extreme Risk): The initial risk was Extreme because a fall is likely to be fatal. We selected Engineering controls (scaffolding) rather than just PPE (harness) because the hierarchy of control demands higher order measures for extreme risks. Even with scaffolding, the risk remains High due to the severity of potential falls, so work methods must be strict.

  2. Silica Dust (Extreme Risk): Cutting tiles creates a lot of dust. Wet cutting is a substitution/engineering control that suppresses the dust at the source. This drastically reduces the risk compared to just relying on masks.

  3. Water Heater (High Risk): Manual handling injuries are common in plumbing. Using a trolley is a simple engineering control that saves backs and complies with the manual handling Code of Practice.

About this Example

Part of the Risk Assessment Matrix document collection

Document Type

Risk Assessment Matrix

A Risk Assessment Matrix is a visual tool used by Australian businesses and tradespeople to evaluate workplace safety hazards by rating the likelihood and severity of potential risks.

Complexity

moderate

Risk Level

high