SWMS - Roof Tiler Example
Example document for SWMS - Roof Tiler. Use this as a reference when creating your own.
Professional Review Required
This document involves significant legal, financial, or compliance considerations. You must have a qualified professional review and approve this document before use. Do not rely on this template as legal advice.
Document: SWMS - Roof Tiler
Example Document
Last updated 7/30/2026
SAFE WORK METHOD STATEMENT (SWMS)
Company/Business Name: Apex Roofing Solutions Pty Ltd ABN: 12 345 678 901 Site Address: 42 Smith Street, Parramatta NSW 2150 Date of Preparation: 12 October 2023
1. JOB DETAILS
Project Title: Smith Residence Re-roof Job Description: Removal of old corrugated iron and installation of new concrete tiles on single story dwelling. Specific High-Risk Work: Working at heights over 2 metres Date of Work: 20 Oct 2023 to 25 Oct 2023 Principal Contractor: Apex Roofing Solutions Person Responsible: John Smith
2. TASK BREAKDOWN
- Site setup and scaffold erection.
- Removal of old roof sheets and debris.
- Installation of sarking and battens.
- Laying concrete tiles.
- Installing ridge caps and pointing.
3. HAZARD IDENTIFICATION & RISK ASSESSMENT
| Step | Hazard | Risk | Harm | Rating |
|---|---|---|---|---|
| 1 | Contact with live wires on roof | Electrocution | Death | H |
| 2 | Falling through rotted roofing | Fall from height | Fractures | H |
| 3 | Manual handling of tile packs | Back injury | Strain | M |
4. CONTROL MEASURES
Hazard: Fall from Height
- Control 1: Erect 2m high perimeter scaffold with handrails and toe boards before work starts.
- Control 2: Install safety mesh (AS 3972) over rafters immediately after old roof removal.
- Control 3: Workers to wear full harness connected to anchor point while installing mesh.
- Control 4: Keep work area clean and dry to prevent slips.
Hazard: Electrocution
- Control 1: Contact Ausgrid services to isolate solar panels before starting.
- Control 2: Identify all cable runs on roof plan.
- Control 3: Use non-contact voltage tester before touching cables.
5. PPE CHECKLIST
- Helmets (Vented)
- Steel Capped Boots
- Hi-Vis Shirts
- Safety Glasses
- Gloves
6. EMERGENCY PROCEDURES
Emergency Contact: 000 Hospital: Westmead Hospital First Aid: Located in Site Van
7. SIGN OFF
| Worker Name | Signature | Date |
|---|---|---|
| B. Jones | ............ | 20/10/23 |
| M. Brown | ............ | 20/10/23 |
| J. Smith | ............ | 20/10/23 |
Notes
This example shows a typical residential re-roofing job. Note the focus on scaffold and mesh as the primary engineering controls. The isolation of solar panels is a specific hazard noted for modern Australian homes.
About this Example
Part of the SWMS - Roof Tiler document collection
Document Type
SWMS - Roof Tiler
This SWMS is required for all roofing work involving the installation, repair, or renovation of roof tiles. It covers high-risk construction work including work at heights and manual handling.