SWMS - Roof Tiler Example

Example document for SWMS - Roof Tiler. Use this as a reference when creating your own.

Professional Review Required

This document involves significant legal, financial, or compliance considerations. You must have a qualified professional review and approve this document before use. Do not rely on this template as legal advice.

Document: SWMS - Roof Tiler

Example Document

Last updated 7/30/2026

SAFE WORK METHOD STATEMENT (SWMS)

Company/Business Name: Apex Roofing Solutions Pty Ltd ABN: 12 345 678 901 Site Address: 42 Smith Street, Parramatta NSW 2150 Date of Preparation: 12 October 2023

1. JOB DETAILS

Project Title: Smith Residence Re-roof Job Description: Removal of old corrugated iron and installation of new concrete tiles on single story dwelling. Specific High-Risk Work: Working at heights over 2 metres Date of Work: 20 Oct 2023 to 25 Oct 2023 Principal Contractor: Apex Roofing Solutions Person Responsible: John Smith

2. TASK BREAKDOWN

  1. Site setup and scaffold erection.
  2. Removal of old roof sheets and debris.
  3. Installation of sarking and battens.
  4. Laying concrete tiles.
  5. Installing ridge caps and pointing.

3. HAZARD IDENTIFICATION & RISK ASSESSMENT

StepHazardRiskHarmRating
1Contact with live wires on roofElectrocutionDeathH
2Falling through rotted roofingFall from heightFracturesH
3Manual handling of tile packsBack injuryStrainM

4. CONTROL MEASURES

Hazard: Fall from Height

  • Control 1: Erect 2m high perimeter scaffold with handrails and toe boards before work starts.
  • Control 2: Install safety mesh (AS 3972) over rafters immediately after old roof removal.
  • Control 3: Workers to wear full harness connected to anchor point while installing mesh.
  • Control 4: Keep work area clean and dry to prevent slips.

Hazard: Electrocution

  • Control 1: Contact Ausgrid services to isolate solar panels before starting.
  • Control 2: Identify all cable runs on roof plan.
  • Control 3: Use non-contact voltage tester before touching cables.

5. PPE CHECKLIST

  • Helmets (Vented)
  • Steel Capped Boots
  • Hi-Vis Shirts
  • Safety Glasses
  • Gloves

6. EMERGENCY PROCEDURES

Emergency Contact: 000 Hospital: Westmead Hospital First Aid: Located in Site Van

7. SIGN OFF

Worker NameSignatureDate
B. Jones............20/10/23
M. Brown............20/10/23
J. Smith............20/10/23

Notes

This example shows a typical residential re-roofing job. Note the focus on scaffold and mesh as the primary engineering controls. The isolation of solar panels is a specific hazard noted for modern Australian homes.

About this Example

Part of the SWMS - Roof Tiler document collection

Document Type

SWMS - Roof Tiler

This SWMS is required for all roofing work involving the installation, repair, or renovation of roof tiles. It covers high-risk construction work including work at heights and manual handling.

Complexity

complex

Risk Level

high