This SWMS is required by WHS Regulation 2011 for roof tiling work involving a risk of falling over two metres. It details hazard identification, risk controls, and safety procedures to protect workers during high-risk construction activities.
This SWMS is required for all roofing work involving the installation, repair, or renovation of roof tiles. It covers high-risk construction work including work at heights and manual handling.
20 free credits on signup — no card needed
About this Document
What Is a SWMS - Roof Tiler? A Safe Work Method Statement (SWMS) for a roof tiler is a critical document that outlines the high-risk activities involved in roofing work. It details how a tiler will perform specific tasks safely and what measures will be put in place to manage health and safety risks. In Australia, this is not just paperwork; it is a legal requirement for high-risk construction work. For roof tilers, the primary risk is working at heights. Because roof tiling typically involves working above two meters, it falls under the category of High Risk Construction Work (HRCW) under the Work Health and Safety (WHS) Regulations. The SWMS serves as a blueprint for safety on the job site. It identifies the hazards, assesses the risks, and sets out the control measures that must be followed. The document acts as a communication tool between the business owner, the supervisors, and the workers on the roof. It ensures everyone understands the risks before work starts. It is also the first document a SafeWork inspector will ask to see if they visit your site. If you cannot produce a relevant SWMS, or if the work being done does not match the document, you can face significant fines and stop-work orders. You might use a roof tiling SWMS template to get started, but it must be customized to your specific site to be legally valid. ## When to Use This Document You must prepare and follow a SWMS for roof tiling work whenever the task involves High Risk Construction Work. Under the Work Health and Safety Regulations 2011 (or state equivalent), specific triggers make a SWMS mandatory. ### High Risk Construction Work Triggers For roof tilers, the most common trigger is the risk of a fall. Regulation 291 of the model WHS Regulations states that a SWMS is required for construction work that involves:
- A risk of a person falling more than 2 meters.
- Work on a roof with a pitch exceeding 26 degrees.
- Work near an unprotected edge or opening. Even if the work seems minor, such as a repair job on a residential house, if a worker is exposed to a fall of two meters or more, a SWMS is required. ### Project Value Thresholds If you are working on a construction project valued at more than $250,000, the Principal Contractor (PC) has stricter obligations. In NSW, under the WHS Regulation 2017, the PC must take all reasonable steps to obtain the SWMS from the contractor before the work begins. They must also keep a copy at the workplace while the work is being done. If you are a subcontractor, you must provide your SWMS to the Principal Contractor. ### Consultation Requirements You must use the SWMS before work commences. It is best practice to review the document as part of a "Toolbox Talk" or pre-start meeting. This ensures that the workers doing the job understand the hazards and the controls. The law requires that the SWMS be prepared in consultation with those workers. You cannot simply write a SWMS in the office without input from your team and expect it to meet compliance standards. ### Victorian Variations If you are working in Victoria, the laws are slightly different but the outcome is the same. Under the Occupational Health and Safety Regulations 2017 (Vic), Division 5, a SWMS is required for construction work where a person may fall more than two meters. While the Act name differs from the harmonised WHS laws used in other states, the requirement to identify and control fall risks remains consistent. ## Key Sections and Required Elements A compliant SWMS cannot be a generic checklist. It must address specific statutory requirements found in Regulation 299 of the model WHS Regulations. To pass an inspection, your document needs distinct sections that address the nature of the roofing work. ### High-Risk Construction Work Checklist The first section of the document is usually a checklist that identifies if the work is actually High Risk Construction Work. This checklist asks questions such as:
- Does the work involve a risk of a fall over 2 meters?
- Does the work involve the use of explosives?
- Does the work involve work on or near energized electrical installations? For a roof tiler, the fall question will almost always be checked "Yes." This section confirms that a SWMS is legally necessary for the job. ### Hazard Identification and Risk Assessment This is the core of the document. You must list the specific hazards associated with roof tiling. Common hazards include:
- Falling from heights (from the roof edge or through the roof structure).
- Falling objects (tiles dropping onto workers or the public below).
- Manual handling injuries (from lifting heavy bundles of tiles).
- Exposure to extreme weather (UV radiation, heat stress, or wind).
- Slips, trips, and falls (on dust, moss, or loose tiles). You should use a risk matrix to rate these risks before controls are applied. You consider the likelihood of an incident happening and the potential consequence. ### Control Measures This section must describe how the risks will be controlled. This is where the "Hierarchy of Controls" comes into play. You cannot simply rely on Personal Protective Equipment (PPE) like a use. The SWMS must outline higher-level controls such as:
- Elimination: Can the work be done on the ground? (e.g., pre-fabricating roof sections).
- Engineering Controls: Installing scaffolding, edge protection, or guard rails.
- Administrative Controls: Implementing "No Go" zones, exclusion zones for the public below, and weather monitoring. If you are using a use system as a control, the SWMS must detail the type of anchor points used. This aligns with AS/NZS 1891.4, the standard for industrial fall-arrest systems. ### Monitoring and Review Regulation 299 requires that the SWMS describes how the control measures will be monitored and reviewed. This means the document is not static. It needs a mechanism to ensure that the safety measures are actually being used. This section often includes a sign-off area for the site supervisor and a review date if the site conditions change. ## How to Write a SWMS - Roof Tiler (Step by Step) Writing a SWMS requires a practical approach. You need to look at the actual site and the specific tasks your tilers will perform. Follow these steps to create a document that is compliant and useful. ### Step 1: Assess the Site Specifics Before you write anything, walk around the site. Look at the roof pitch, the height, and the ground conditions. Check for overhead powerlines. Identify where you will stack the tiles. A generic SWMS for "Roof Tiling" will fail if it does not account for a powerline running directly next to the house or a brittle asbestos roof on an extension. Take note of the access points. Will you need a ladder, a scaffold tower, or a hoist to lift tiles? These details must be recorded in your construction safety plan. ### Step 2: Consult Your Workers Sit down with your team. Ask them what risks they see. They are the ones on the tools and often spot hazards that management misses. For example, they might point out that the valley iron is slippery when wet. Including this input satisfies the consultation requirements under Section 47 of the WHS Act. ### Step 3: Break Down the Job Steps List the job in a logical sequence. Do not just write "Tile Roof." Break it down into steps:
- Load and stack tiles.
- Install edge protection and scaffolding.
- Install safety mesh (if applicable).
- Lay valley tiles.
- Lay field tiles.
- Cut tiles and install ridge capping.
- Clean up and remove waste. ### Step 4: Identify Hazards and Risks for Each Step Go through each step and identify what could go wrong.
- Loading tiles: Hazard - Strain from lifting heavy bundles. Hazard - Falling materials.
- Laying field tiles: Hazard - Falling off the edge. Hazard - Slipping on loose tiles. ### Step 5: Select Controls Using the Hierarchy For each hazard, select a control measure. Start from the top of the hierarchy.
- Falling off edge: Do not just write "Wear use." Write "Install perimeter scaffold and edge protection prior to commencing work."
- Slipping on tiles: Write "Sweep roof surface regularly to remove dust and debris. Wear non-slip safety footwear." Ensure your control measures reference relevant standards. For instance, the installation of roof tiles should comply with AS 3976 (Installation of roof tiles). Your SWMS should note that inadequate fixings could lead to tile collapse, which is a safety hazard as well as a quality issue. ### Step 6: Define Emergency Procedures Outline what happens if something goes wrong. Where is the first aid kit? Who is the first aid officer? What is the address for emergency services? If a worker falls, how will you rescue them? A use system requires a rescue plan; you cannot leave a worker suspended indefinitely. ### Step 7: Sign and Review Print the SWMS and have it signed by the Principal Contractor (if applicable), the site supervisor, and all the workers. This signature acknowledges that the workers have read and understood the method. Keep the SWMS accessible while work is underway. Many tilers now keep digital copies on tablets or laminated copies in the site shed. ## Common Mistakes to Avoid Many businesses treat SWMS as a tick-and-flick exercise. This approach is dangerous and can lead to prosecution. Inspectors are trained to spot documents that are "administrative dust-gatherers" rather than practical safety tools. ### Using Generic Documents The most common mistake is downloading a template and filling in the blanks without thinking. A SWMS written for a new build on a flat block will not work for a re-tiling job on a steep, two-story heritage home with brittle roofing. Regulators penalise this because it fails the test of specificity. If your SWMS says "Work near traffic" but you are on a quiet cul-de-sac, an inspector will know you copied and pasted. ### Over-reliance on PPE Writing "Wear PPE" as your only control measure is a major error. The law requires you to minimise risk so far as is reasonably practicable. Relying solely on a use (PPE) is a last resort. If you can use scaffolding or a scissor lift (Engineering controls), you must. A SWMS that says "Workers will be careful" or "Workers will hold onto the structure" provides no legal defence and is a failure to provide a safe workplace. ### Ignoring Manual Handling Roof tiles are heavy. Lifting them repeatedly causes musculoskeletal injuries. A common oversight in SWMS documents is ignoring the manual handling risks. You need to address how tiles are loaded onto the roof. Will you use a tile elevator? Will you limit the weight of bundles? Failure to address this shows a lack of thorough risk assessment. ### Forgetting to Sign or Keep it Available A SWMS is not valid until it is signed. If an inspector arrives and the SWMS is sitting in a drawer at the office, or the workers on the roof have not signed it, you are non-compliant. The document must be available for inspection at the workplace until the work is completed. ## Legal Considerations (AU) Operating a roofing business in Australia requires strict adherence to health and safety laws. The penalties for non-compliance are severe, ranging from on-the-spot fines to imprisonment for individuals. ### PCBU Duties The Person Conducting a Business or Undertaking (PCBU)-usually the business owner or contractor-has the primary duty of care under the Work Health and Safety Act 2011 (Cth) and corresponding state acts. You must ensure, so far as is reasonably practicable, the health and safety of workers. This includes providing safe systems of work, which is exactly what a SWMS is. ### Officer Responsibilities Company officers (directors and secretaries) have a due diligence duty to ensure the PCBU complies with its obligations. If an incident occurs and it is found that officers failed to ensure a SWMS was in place for high-risk work, they can be held personally liable. ### State Variations and Safe Work Authorities While most states have harmonised WHS laws, enforcement is handled by state authorities.
- NSW: SafeWork NSW enforces the WHS Regulation 2017. They have specific guidelines for housing construction and falls.
- Victoria: WorkSafe Victoria enforces the OHS Act 2004 and OHS Regulations 2017.
- Queensland: Workplace Health and Safety Queensland enforces the WHS Act. If your work involves asbestos, such as removing old asbestos roof sheets before tiling, you must also comply with the Code of Practice: How to Safely Remove Asbestos. This often requires a separate license and notification. ### Industry Awards and Fair Work While this guide focuses on safety, the terms of employment for roof tilers are covered by the Building and Construction General On-site Award or the Modern Plumbing and Roofing Award. Ensuring a safe work environment via a SWMS helps you meet your obligations under the Fair Work Act 2009 regarding providing a safe workplace. ### Insurance and Documentation Your public liability and workers' compensation insurers may request your SWMS in the event of a claim. If an accident happens and you do not have a compliant SWMS, your insurance coverage could be jeopardised. The document serves as evidence that you took reasonable steps to manage risk. ## Frequently Asked Questions (preview) ### Do I need a SWMS for small repair jobs? Yes, if the work involves a risk of a fall over two meters. Even small repair jobs on a two-story house or a steep single-story roof require a SWMS. ### Can I use a digital SWMS on my phone? Yes. Digital SWMS are increasingly common and are accepted by regulators. The key is that the content must be accessible to workers and easily readable. Ensure your digital system allows for electronic signatures. ### How often should I review my SWMS? You must review the SWMS if there is a change in the work environment or if a control measure is not effective. Best practice is to review it at the start of each new project or site. ### Who is responsible for the SWMS? The PCBU (the employer or contractor) is responsible for preparing the SWMS. However, it must be prepared in consultation with the workers who will carry out the work. ### Is a "Take 5" the same as a SWMS? No. A "Take 5" or pre-start checklist is a short hazard assessment used daily. A SWMS is a more document required for high-risk construction work that details the specific methodology and controls for the entire job. You often use a Take 5 to confirm the controls in the SWMS are still in place that day.
Key Facts
- A SWMS is mandatory for all high-risk construction work including work where there is a risk of a fall over 2 metres.— WHS Regulation 2011
- The PCBU must prepare the SWMS before the high-risk work starts and consult with workers.— WHS Regulation 2011
- Control measures must follow the hierarchy of controls, prioritizing elimination over PPE.— Code of Practice: Managing the risks of falls in housing construction
- Edge protection must be provided if a person could fall more than 2 metres on residential housing construction.— WHS Regulation 2011
- Safety mesh must comply with AS 3972 to be used as a fall protection system for roof work.— Australian Standards
- Workers must stop work if they believe the SWMS is not being followed or the work is unsafe.— WHS Act 2011
Sources
Required Sections
Hazard Identification
Identifying all potential safety risks specific to the roof tiling site and task.
The following hazards have been identified for the project at [SITE ADDRESS]. These risks are specific to the roof tiling work on [BUILDING TYPE] and comply with the Work Health and Safety Regulations 2011. Falls from Heights Workers are exposed to falls while accessing the roof via ladders and working on the roof pitch. The risk is increased by [SPECIFIC ROOF FEATURE]. All work over 2 meters requires physical fall protection systems. Manual Handling Handling bundles of tiles and materials creates strain on the back and joints. Loads are heavy and awkward to carry up ladders or onto scaffolding. Sun and Heat Exposure Work is conducted outdoors with direct UV exposure. Heat stress is a significant risk during [SUMMER MONTHS]. Falling Objects Tools and materials may fall from the roof level, endangering workers and the public below.
Risk Assessment
Evaluating the likelihood and severity of identified hazards to determine risk ratings.
Risk Assessment Matrix The following risks have been assessed for the project at [PROJECT ADDRESS] in accordance with the Code of Practice: Construction Work. | Hazard | Risk Description | Initial Rating (H/M/L) | Control Measures | Residual Rating (H/M/L) | | :--- | :--- | :--- | :--- | :--- | | Falls from height | Workers falling from roof edges or through voids while laying tiles. | High | 1. Install perimeter edge protection or scaffolding compliant with AS/NZS 1576.<br>2. Use a static line or fall restraint use system.<br>3. Ensure tile bundles are stacked safely to prevent instability. | Low | | Manual Handling | Straining back or muscles while lifting heavy packs of tiles or mortar. | Medium | 1. Use mechanical aids (tile trolley, hoist) where possible.<br>2. Store tiles at waist height to limit bending.<br>3. Rotate tasks and take regular breaks. | Low | | Falling Objects | Tools or tiles dropping onto workers or public below. | High | 1. Establish an exclusion zone of [NUMBER] meters around the roof perimeter.<br>2. Secure all tools with lanyards.<br>3. Use toe boards on scaffolding to prevent objects rolling off. | Low | | Weather Conditions | Heat stress or slips due to wet surfaces. | Medium | 1. Monitor weather forecasts via [BUREAU NAME].<br>2. Stop work if roof is wet or slippery.<br>3. Provide sunscreen, water, and shaded rest breaks for UV protection. | Low |
Control Measures
Implementing the hierarchy of controls to eliminate or minimise risks.
Work at Heights Apply the hierarchy of controls by installing a scaffolding system to eliminate the fall risk where possible. If scaffolding is not practical, install a static line and secure a full body safety use at all times while on the roof. Inspect all fall protection equipment before use and comply with AS/NZS 1891.4 for use inspection and maintenance. Manual Handling Use mechanical aids such as tile lifts or conveyors to move tiles to the roof level and reduce physical strain. Store materials close to the work area to limit carrying distances. Ensure workers participate in manual handling training to understand safe lifting techniques. Public Safety Erect [TYPE OF BARRIER] around the perimeter of the work zone to prevent unauthorised access. Display clearly visible warning signs at all entry points to the site. Drop tools and debris into a debris net or designated chute rather than lowering them by hand to protect pedestrians below.
PPE Requirements
Listing necessary Personal Protective Equipment for the job.
Workers are required to wear the following Personal Protective Equipment at all times while on site: * Head Protection: AS/NZS 1801 compliant safety helmet or bump cap to be worn when working under the eaves or where there is a risk of object fall.
- Eye Protection: Safety glasses or goggles must be worn when cutting tiles with an angle grinder or power saw.
- High-Visibility Clothing: Class D or N daytime high-visibility vest compliant with AS/NZS 4602.1.
- Footwear: Safety boots with steel midsoles and oil-resistant soles to prevent punctures from nails and ensure grip on scaffolding.
- Sun Protection: Broad-brimmed hat, SPF 30+ sunscreen, and long-sleeved shirt.
- Height Safety Equipment: [FULL_BODY_USE] complying with AS/NZS 1891.4 attached to [ANCHOR_TYPE] via a [LANYARD_TYPE] and energy absorber. Do not use damaged or wet webbing.
- Hearing Protection: Class 5 ear muffs to be worn during noise-intensive tasks such as [SPECIFIED_NOISY_TASK].
Emergency Procedures
Steps to take in the event of an accident or injury on site.
In the event of an accident or injury, the injured person must stop work immediately. The nearest worker must call 000 and then contact the Site Supervisor, [SUPERVISOR NAME], at [PHONE NUMBER]. First aid is located at [FIRST AID LOCATION]. For fires, activate the nearest alarm and evacuate to the assembly point at [ASSEMBLY POINT]. Do not use elevators during an evacuation. If severe weather creates unsafe conditions, cease roof work immediately and move to ground level. The Site Supervisor must record all incidents in the site register.
Training and Competency
Verifying worker qualifications and site induction status.
Workers engaged in roof tiling activities must hold a valid Certificate III in Roof Tiling (CPC30320) or equivalent. Verification of competency for [WORKER_NAME] is attached, showing current training in working safely at heights above 2 meters as required by WHS Regulations. All personnel have completed the [COMPANY_NAME] site induction for [SITE_NAME] on [DATE]. A toolbox talk was conducted this morning to review specific fall risks, and attendance records are signed by the team. Evidence of high-risk work licenses is available on request.
Review and Monitoring
Processes for ensuring the SWMS remains effective and up to date.
This SWMS is reviewed by the Site Supervisor before work commences and discussed during daily pre-start toolbox talks to ensure all workers understand the current risks. Workers must immediately notify the Supervisor of any new hazards or changes to the roof structure or weather conditions that may affect safety. The Site Supervisor monitors the effectiveness of control measures throughout the day. If a control measure fails or site conditions change, work stops until the SWMS is updated and the changes are communicated to the team. This document is kept on-site at [Project Address] for the duration of the project to ensure compliance with the Work Health and Safety Regulations 2011.
Frequently Asked Questions
What is a SWMS - Roof Tiler?
When is this SWMS legally required?
Who is responsible for preparing this SWMS?
What PPE is required for roof tiling?
How often should a SWMS be reviewed?
Can a generic SWMS be used for every site?
What are the main control measures for falls when tiling?
Explore More Process Documents
Ready to create your document?
Use our free template or generate a custom version tailored to your needs.
20 free credits on signup — no card needed
This document involves significant legal or financial considerations. Professional review is strongly recommended.