PropoDoc provides self-help document templates and tools. It is not a law firm and does not provide legal advice. Learn more.
Skip to main content
Template
Free

SWMS - Roof Tiler Template

Template for SWMS - Roof Tiler. Customize this template for your specific needs.

Professional Review Required

This document involves significant legal, financial, or compliance considerations. You must have a qualified professional review and approve this document before use. Do not rely on this template as legal advice.

Document: SWMS - Roof Tiler

Template Preview

Version 1 • Last updated 7/30/2026

SAFE WORK METHOD STATEMENT (SWMS)

Company/Business Name: [INSERT COMPANY NAME] ABN: [INSERT ABN] Site Address: [INSERT SITE ADDRESS] Date of Preparation: [INSERT DATE]

1. JOB DETAILS

Project Title: [INSERT PROJECT TITLE] Job Description: [e.g., Installation of terracotta tiles on new double story dwelling] Specific High-Risk Work: Working at heights (Roof Tiling) over 2 metres Date of Work: From [START DATE] to [END DATE] Principal Contractor: [INSERT NAME] Person Responsible for SWMS: [INSERT NAME/SIGNATURE]

2. TASK BREAKDOWN (STEP BY STEP)

StepDescription of Task
1Pre-start site induction and hazard identification
2Set up of access equipment (Ladders, Scaffolding, Hoists)
3Delivery and manual handling of roof tiles to roof level
4Installation of sarking and safety mesh
5Fixing of battens and counter battens
6Laying and fixing of roof tiles
7Installation of ridge capping and flashings
8Cutting and grinding tiles
9Clean up and dismantling of access equipment

3. HAZARD IDENTIFICATION & RISK ASSESSMENT

StepHazardRiskHarmInitial Rating (L/M/H)
1Uneven ground, debrisFall from groundSprains/StrainsM
2Unstable ladder/scaffoldFall from heightDeath/ serious injuryH
3Heavy lifting, awkward posturesMusculoskeletal injuryChronic painH
4Working on edge of roofFall through roof or off edgeDeath/ serious injuryH
5Nail gun usePuncture woundsInfection/AmputationM
6Dust from cuttingSilicosis/Respiratory issuesLong term illnessM
7UV RadiationSunburn/Heat strokeSkin cancerM
8Overhead powerlinesElectrocutionDeathH

4. CONTROL MEASURES

HazardControl Measures (Hierarchy of Controls)
Falls from Height1. Install perimeter scaffold with edge protection (Engineering). <br> 2. Install safety mesh compliant with AS 3972 prior to tiling (Engineering). <br> 3. Use travel restraint systems where scaffold is not practicable (Engineering). <br> 4. Use full safety use with lanyard connected to certified anchor point (PPE).
Manual Handling1. Use tile elevators or conveyors to lift materials to roof (Elimination/Substitution). <br> 2. Store tiles close to work area to minimize carrying (Administration). <br> 3. Team lift heavy bundles (Administration). <br> 4. Wear back support if required (PPE).
Falling Objects1. Use toe boards on scaffolding (Engineering). <br> 2. Establish exclusion zone below work area (Administration). <br> 3. Secure loose tools with lanyards (Administration). <br> 4. Wear hard hat (PPE).
Electricity1. Identify powerlines before work starts (Elimination). <br> 2. Maintain minimum clearance distances (Administration). <br> 3. Use 'No Go' zones (Administration). <br> 4. Use fiberglass ladders near powerlines (Substitution).
Dust/Noise1. Use wet cutting methods for tiles (Elimination). <br> 2. Use dust extraction attachments (Engineering). <br> 3. Wear P2 dust mask and ear muffs (PPE).

5. PERSONAL PROTECTIVE EQUIPMENT (PPE)

  • Safety Helmet (AS/NZS 1801) - White or High Vis
  • Safety Boots (AS/NZS 2210) - Non-slip sole
  • High Visibility Clothing (Class D/N)
  • Eye Protection (Safety Glasses)
  • Hearing Protection (Class 5) - when cutting/grinding
  • Respiratory Protection (P2 Mask) - when cutting/grinding
  • Sun Protection (Sunscreen 30+, Wide brim hat)
  • Safety Use (if required)
  • Cut Resistant Gloves (when handling tiles)

6. EMERGENCY PROCEDURES

Emergency Contact: 000 Nearest Hospital: [INSERT HOSPITAL NAME AND ADDRESS] First Aid Kit Location: [INSERT LOCATION, e.g., Site Office] Fire Extinguisher Location: [INSERT LOCATION]

Procedure for Injury:

  1. Stop work immediately.
  2. Ensure area is safe to enter.
  3. Apply First Aid.
  4. Call 000 if necessary.
  5. Notify Supervisor/PCBU.
  6. Preserve incident scene (if notifiable incident).

7. TRAINING & COMPETENCY

Workers undertaking this task must hold:

  • General Construction Induction Card (White Card)
  • Working at Heights Training (optional but recommended)
  • Specific evidence of competency for powered plant (if used)

Site Induction Completed: [YES/NO] Task Specific Toolbox Talk Completed: [YES/NO]

8. SIGN OFF

I have read and understood the contents of this SWMS. I agree to follow all control measures listed.

Worker NameSignatureDate
[WORKER 1][DATE]
[WORKER 2][DATE]
[WORKER 3][DATE]
[SUPERVISOR][DATE]
Use in GeneratorView Guide

About this Template

Part of the SWMS - Roof Tiler document collection

Document Type

SWMS - Roof Tiler

This SWMS is required for all roofing work involving the installation, repair, or renovation of roof tiles. It covers high-risk construction work including work at heights and manual handling.

Complexity

complex

Format

form