SWMS - Roof Tiler Template
Template for SWMS - Roof Tiler. Customize this template for your specific needs.
Professional Review Required
This document involves significant legal, financial, or compliance considerations. You must have a qualified professional review and approve this document before use. Do not rely on this template as legal advice.
Document: SWMS - Roof Tiler
Template Preview
Version 1 • Last updated 7/30/2026
SAFE WORK METHOD STATEMENT (SWMS)
Company/Business Name: [INSERT COMPANY NAME] ABN: [INSERT ABN] Site Address: [INSERT SITE ADDRESS] Date of Preparation: [INSERT DATE]
1. JOB DETAILS
Project Title: [INSERT PROJECT TITLE] Job Description: [e.g., Installation of terracotta tiles on new double story dwelling] Specific High-Risk Work: Working at heights (Roof Tiling) over 2 metres Date of Work: From [START DATE] to [END DATE] Principal Contractor: [INSERT NAME] Person Responsible for SWMS: [INSERT NAME/SIGNATURE]
2. TASK BREAKDOWN (STEP BY STEP)
| Step | Description of Task |
|---|---|
| 1 | Pre-start site induction and hazard identification |
| 2 | Set up of access equipment (Ladders, Scaffolding, Hoists) |
| 3 | Delivery and manual handling of roof tiles to roof level |
| 4 | Installation of sarking and safety mesh |
| 5 | Fixing of battens and counter battens |
| 6 | Laying and fixing of roof tiles |
| 7 | Installation of ridge capping and flashings |
| 8 | Cutting and grinding tiles |
| 9 | Clean up and dismantling of access equipment |
3. HAZARD IDENTIFICATION & RISK ASSESSMENT
| Step | Hazard | Risk | Harm | Initial Rating (L/M/H) |
|---|---|---|---|---|
| 1 | Uneven ground, debris | Fall from ground | Sprains/Strains | M |
| 2 | Unstable ladder/scaffold | Fall from height | Death/ serious injury | H |
| 3 | Heavy lifting, awkward postures | Musculoskeletal injury | Chronic pain | H |
| 4 | Working on edge of roof | Fall through roof or off edge | Death/ serious injury | H |
| 5 | Nail gun use | Puncture wounds | Infection/Amputation | M |
| 6 | Dust from cutting | Silicosis/Respiratory issues | Long term illness | M |
| 7 | UV Radiation | Sunburn/Heat stroke | Skin cancer | M |
| 8 | Overhead powerlines | Electrocution | Death | H |
4. CONTROL MEASURES
| Hazard | Control Measures (Hierarchy of Controls) |
|---|---|
| Falls from Height | 1. Install perimeter scaffold with edge protection (Engineering). <br> 2. Install safety mesh compliant with AS 3972 prior to tiling (Engineering). <br> 3. Use travel restraint systems where scaffold is not practicable (Engineering). <br> 4. Use full safety use with lanyard connected to certified anchor point (PPE). |
| Manual Handling | 1. Use tile elevators or conveyors to lift materials to roof (Elimination/Substitution). <br> 2. Store tiles close to work area to minimize carrying (Administration). <br> 3. Team lift heavy bundles (Administration). <br> 4. Wear back support if required (PPE). |
| Falling Objects | 1. Use toe boards on scaffolding (Engineering). <br> 2. Establish exclusion zone below work area (Administration). <br> 3. Secure loose tools with lanyards (Administration). <br> 4. Wear hard hat (PPE). |
| Electricity | 1. Identify powerlines before work starts (Elimination). <br> 2. Maintain minimum clearance distances (Administration). <br> 3. Use 'No Go' zones (Administration). <br> 4. Use fiberglass ladders near powerlines (Substitution). |
| Dust/Noise | 1. Use wet cutting methods for tiles (Elimination). <br> 2. Use dust extraction attachments (Engineering). <br> 3. Wear P2 dust mask and ear muffs (PPE). |
5. PERSONAL PROTECTIVE EQUIPMENT (PPE)
- Safety Helmet (AS/NZS 1801) - White or High Vis
- Safety Boots (AS/NZS 2210) - Non-slip sole
- High Visibility Clothing (Class D/N)
- Eye Protection (Safety Glasses)
- Hearing Protection (Class 5) - when cutting/grinding
- Respiratory Protection (P2 Mask) - when cutting/grinding
- Sun Protection (Sunscreen 30+, Wide brim hat)
- Safety Use (if required)
- Cut Resistant Gloves (when handling tiles)
6. EMERGENCY PROCEDURES
Emergency Contact: 000 Nearest Hospital: [INSERT HOSPITAL NAME AND ADDRESS] First Aid Kit Location: [INSERT LOCATION, e.g., Site Office] Fire Extinguisher Location: [INSERT LOCATION]
Procedure for Injury:
- Stop work immediately.
- Ensure area is safe to enter.
- Apply First Aid.
- Call 000 if necessary.
- Notify Supervisor/PCBU.
- Preserve incident scene (if notifiable incident).
7. TRAINING & COMPETENCY
Workers undertaking this task must hold:
- General Construction Induction Card (White Card)
- Working at Heights Training (optional but recommended)
- Specific evidence of competency for powered plant (if used)
Site Induction Completed: [YES/NO] Task Specific Toolbox Talk Completed: [YES/NO]
8. SIGN OFF
I have read and understood the contents of this SWMS. I agree to follow all control measures listed.
| Worker Name | Signature | Date |
|---|---|---|
| [WORKER 1] | [DATE] | |
| [WORKER 2] | [DATE] | |
| [WORKER 3] | [DATE] | |
| [SUPERVISOR] | [DATE] |
About this Template
Part of the SWMS - Roof Tiler document collection
Document Type
SWMS - Roof Tiler
This SWMS is required for all roofing work involving the installation, repair, or renovation of roof tiles. It covers high-risk construction work including work at heights and manual handling.