Template for SWMS - Stonemason. Customize this template for your specific needs.

Professional Review Required

This document involves significant legal, financial, or compliance considerations. You must have a qualified professional review and approve this document before use. Do not rely on this template as legal advice.

Document: SWMS - Stonemason

Template Preview

Version 1 • Last updated 7/30/2026

SWMS - Stonemason

Company/Business Name: [Insert Company Name] ABN: [Insert ABN] Site Address: [Insert Site Address] Date of Preparation: [DD/MM/YYYY]

1. JOB DETAILS

Project Title: [Insert Project Title] Specific Location of Work: [Insert specific location e.g. Kitchen, Bathroom, Exterior Facade] Date(s) of Work: From [Start Date] to [End Date] Description of High Risk Construction Work:

  • Working at heights greater than 2.0 metres
  • Manual handling of loads over 25kg (stone slabs)
  • Use of powered mobile plant (e.g. forklift, scissor lift)
  • Work with silica generating processes (cutting, grinding, polishing)
  • Structural alterations

2. PERSONNEL & TRAINING

Principal Contractor: [Insert Name/Company] PCBU/Site Supervisor: [Insert Name] Phone Number: [Insert Phone]

Worker Signatures:

Worker NameSignatureDateInduction DateLicense No. (if applicable)
[Name]
[Name]

3. TASK BREAKDOWN

List the high-risk activities in sequence.

  1. [Task 1 e.g. Delivery and handling of stone slabs]
  2. [Task 2 e.g. Site preparation and dust barrier setup]
  3. [Task 3 e.g. Cutting stone to size]
  4. [Task 4 e.g. Installation at height]
  5. [Task 5 e.g. Grinding and polishing]

4. HAZARD IDENTIFICATION & RISK ASSESSMENT

High Risk ActivityHazardsRisksRisk Rating (Before Controls)Risk Rating (After Controls)
Lifting stone slabsCrush injury, back strain, sprain/strainFractures, musculoskeletal disorderHighLow
Cutting stone (wet/dry)Silica dust, noise, vibration, rotating partsSilicosis, hearing loss, HAVS, amputationExtremeLow
Working on scaffold/laddersFalls from height, collapse of structureDeath, serious injuryHighLow
Using angle grindersKickback, projectile debris, eye injuriesLacerations, eye damageHighMedium
Chemical use (sealers/adhesives)Skin irritation, inhalation of fumesDermatitis, respiratory issuesMediumLow

5. CONTROL MEASURES (HIERARCHY OF CONTROLS)

General Controls

  • Implement site induction for all workers.
  • Display current SWMS in a visible location.
  • Ensure adequate lighting and ventilation.
  • Maintain clear access ways and emergency exits.
  • First aid kit located at [Insert Location].

Specific Controls by Hazard

Manual Handling & Lifting

  • Elimination: Order stone in sizes that can be handled mechanically or by one person.
  • Substitution: Use lighter-weight materials where possible.
  • Engineering: Use trolleys, slab lifters, vacuum lifters, or scissor lifts.
  • Admin: Implement team lifting techniques (only if mechanical aids not possible). Limit duration of lifting tasks.
  • PPE: Safety boots, gloves.

Silica Dust (Cutting, Grinding, Drilling)

  • Elimination: Do not cut on site if possible (pre-cut offsite). Note: Engineered stone processing is prohibited in Australia.
  • Engineering: ALWAYS use wet cutting methods with continuous water flow to suppress dust. Use tools attached to on-tool dust extraction (Class H or M HEPA filter). Use water suppression on grinders.
  • Admin: Keep workers away from the cutting arc (exclusion zone). Do not use dry cutting. Clean up slurry/water with a HEPA vacuum or wet sweeping methods (no dry sweeping).
  • PPE: P2 or P3 respirator fit-tested to the face. Safety glasses.

Working at Heights

  • Elimination: Prefabricate sections at ground level.
  • Engineering: Use scaffolds tagged by a competent person. Use Mobile Elevating Work Platforms (MEWPs).
  • Admin: Develop a Fall Rescue Plan. Inspect equipment daily.
  • PPE: Full body use with lanyard (when working in boom or if required by scaffold design). Hard hat.

Plant & Equipment

  • Admin: Isolate power sources (Lock Out Tag Out) before changing blades or clearing blockages.
  • PPE: Hearing protection, safety glasses.

6. PERSONAL PROTECTIVE EQUIPMENT (PPE)

  • Safety Helmet (Class 1 or 2)
  • High Visibility Clothing
  • Safety Boots (Steel cap/composite)
  • Eye Protection (Safety glasses/goggles)
  • Hearing Protection (Ear muffs/plugs)
  • Dust Mask (P2/P3 for silica)
  • Cut Resistant Gloves (when handling stone)
  • Sun Protection (if working outdoors)

7. EMERGENCY PROCEDURES

  • Emergency Contact: 000
  • Nearest Hospital: [Insert Hospital Name]
  • First Aid Officer: [Insert Name]
  • Emergency Assembly Point: [Insert Location]
  • Fire Extinguishers located at: [Insert Location]
  • Spill Procedure: Contain spill using absorbent material, prevent entry to drains, dispose of as chemical waste.
  • Rescue at Heights: Ensure access to the ground is available. Do not enter the exclusion zone during an incident until plant is stabilized.

8. SIGN-OFF

I, the undersigned, acknowledge that I have read and understood this SWMS and agree to comply with all control measures listed.

Prepared by: ______________________ Date: _________ (Principal Contractor/PCBU Representative)

Accepted by: ______________________ Date: _________ (Site Supervisor/Client)

Worker Declaration:

NameSignatureDate
Use in GeneratorView Guide

About this Template

Part of the SWMS - Stonemason document collection

Document Type

SWMS - Stonemason

A Safe Work Method Statement for Stonemasons carrying out high-risk construction work like stone installation, cutting, and structural work.