SWMS - Stonemason Template
Template for SWMS - Stonemason. Customize this template for your specific needs.
Professional Review Required
This document involves significant legal, financial, or compliance considerations. You must have a qualified professional review and approve this document before use. Do not rely on this template as legal advice.
Document: SWMS - Stonemason
Template Preview
Version 1 • Last updated 7/30/2026
SWMS - Stonemason
Company/Business Name: [Insert Company Name] ABN: [Insert ABN] Site Address: [Insert Site Address] Date of Preparation: [DD/MM/YYYY]
1. JOB DETAILS
Project Title: [Insert Project Title] Specific Location of Work: [Insert specific location e.g. Kitchen, Bathroom, Exterior Facade] Date(s) of Work: From [Start Date] to [End Date] Description of High Risk Construction Work:
- Working at heights greater than 2.0 metres
- Manual handling of loads over 25kg (stone slabs)
- Use of powered mobile plant (e.g. forklift, scissor lift)
- Work with silica generating processes (cutting, grinding, polishing)
- Structural alterations
2. PERSONNEL & TRAINING
Principal Contractor: [Insert Name/Company] PCBU/Site Supervisor: [Insert Name] Phone Number: [Insert Phone]
Worker Signatures:
| Worker Name | Signature | Date | Induction Date | License No. (if applicable) |
|---|---|---|---|---|
| [Name] | ||||
| [Name] |
3. TASK BREAKDOWN
List the high-risk activities in sequence.
- [Task 1 e.g. Delivery and handling of stone slabs]
- [Task 2 e.g. Site preparation and dust barrier setup]
- [Task 3 e.g. Cutting stone to size]
- [Task 4 e.g. Installation at height]
- [Task 5 e.g. Grinding and polishing]
4. HAZARD IDENTIFICATION & RISK ASSESSMENT
| High Risk Activity | Hazards | Risks | Risk Rating (Before Controls) | Risk Rating (After Controls) |
|---|---|---|---|---|
| Lifting stone slabs | Crush injury, back strain, sprain/strain | Fractures, musculoskeletal disorder | High | Low |
| Cutting stone (wet/dry) | Silica dust, noise, vibration, rotating parts | Silicosis, hearing loss, HAVS, amputation | Extreme | Low |
| Working on scaffold/ladders | Falls from height, collapse of structure | Death, serious injury | High | Low |
| Using angle grinders | Kickback, projectile debris, eye injuries | Lacerations, eye damage | High | Medium |
| Chemical use (sealers/adhesives) | Skin irritation, inhalation of fumes | Dermatitis, respiratory issues | Medium | Low |
5. CONTROL MEASURES (HIERARCHY OF CONTROLS)
General Controls
- Implement site induction for all workers.
- Display current SWMS in a visible location.
- Ensure adequate lighting and ventilation.
- Maintain clear access ways and emergency exits.
- First aid kit located at [Insert Location].
Specific Controls by Hazard
Manual Handling & Lifting
- Elimination: Order stone in sizes that can be handled mechanically or by one person.
- Substitution: Use lighter-weight materials where possible.
- Engineering: Use trolleys, slab lifters, vacuum lifters, or scissor lifts.
- Admin: Implement team lifting techniques (only if mechanical aids not possible). Limit duration of lifting tasks.
- PPE: Safety boots, gloves.
Silica Dust (Cutting, Grinding, Drilling)
- Elimination: Do not cut on site if possible (pre-cut offsite). Note: Engineered stone processing is prohibited in Australia.
- Engineering: ALWAYS use wet cutting methods with continuous water flow to suppress dust. Use tools attached to on-tool dust extraction (Class H or M HEPA filter). Use water suppression on grinders.
- Admin: Keep workers away from the cutting arc (exclusion zone). Do not use dry cutting. Clean up slurry/water with a HEPA vacuum or wet sweeping methods (no dry sweeping).
- PPE: P2 or P3 respirator fit-tested to the face. Safety glasses.
Working at Heights
- Elimination: Prefabricate sections at ground level.
- Engineering: Use scaffolds tagged by a competent person. Use Mobile Elevating Work Platforms (MEWPs).
- Admin: Develop a Fall Rescue Plan. Inspect equipment daily.
- PPE: Full body use with lanyard (when working in boom or if required by scaffold design). Hard hat.
Plant & Equipment
- Admin: Isolate power sources (Lock Out Tag Out) before changing blades or clearing blockages.
- PPE: Hearing protection, safety glasses.
6. PERSONAL PROTECTIVE EQUIPMENT (PPE)
- Safety Helmet (Class 1 or 2)
- High Visibility Clothing
- Safety Boots (Steel cap/composite)
- Eye Protection (Safety glasses/goggles)
- Hearing Protection (Ear muffs/plugs)
- Dust Mask (P2/P3 for silica)
- Cut Resistant Gloves (when handling stone)
- Sun Protection (if working outdoors)
7. EMERGENCY PROCEDURES
- Emergency Contact: 000
- Nearest Hospital: [Insert Hospital Name]
- First Aid Officer: [Insert Name]
- Emergency Assembly Point: [Insert Location]
- Fire Extinguishers located at: [Insert Location]
- Spill Procedure: Contain spill using absorbent material, prevent entry to drains, dispose of as chemical waste.
- Rescue at Heights: Ensure access to the ground is available. Do not enter the exclusion zone during an incident until plant is stabilized.
8. SIGN-OFF
I, the undersigned, acknowledge that I have read and understood this SWMS and agree to comply with all control measures listed.
Prepared by: ______________________ Date: _________ (Principal Contractor/PCBU Representative)
Accepted by: ______________________ Date: _________ (Site Supervisor/Client)
Worker Declaration:
| Name | Signature | Date |
|---|---|---|
About this Template
Part of the SWMS - Stonemason document collection
Document Type
SWMS - Stonemason
A Safe Work Method Statement for Stonemasons carrying out high-risk construction work like stone installation, cutting, and structural work.